Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
SIC 3452 Bolts, Nuts, Rivets, And Washers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0342 # 06 Y:2004 06 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,459 $7,965 Not Implemented
SD0342 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $7,120 $470 Not Implemented
SD0342 # 03 Y:2004 03 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $26,802 $24,875 Not Implemented
SD0342 # 01 Y:2004 01 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $132,869 $208,000 Not Implemented
SD0342 # 04 Y:2004 04 2004 PREHEAT COMBUSTION AIR WITH WASTE HEAT $8,450 $18,000 Not Implemented
SD0330 # 06 Y:2003 06 2003 $96,800 $200,000 Not Implemented
SD0330 # 05 Y:2003 05 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,500 $10,000 Not Implemented
SD0330 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $887 $80 Implemented
SD0330 # 03 Y:2003 03 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,836 $4,000 Not Implemented
SD0330 # 02 Y:2003 02 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,189 $6,000 Not Implemented
SD0330 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,782 $1,425 Not Implemented
SD0141 # 01 Y:1996 01 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,869 $13,500 Not Implemented
SD0141 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,412 $1,200 Not Implemented
SD0141 # 03 Y:1996 03 1996 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,057 $2,600 Not Implemented
SD0141 # 04 Y:1996 04 1996 SEPARATE TREATMENTS FOR EACH TYPE OF SOLUTION AND RECYCLE $7,840 $6,000 Not Implemented
SD0041 # 08 Y:1993 08 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,037 $0 Not Implemented
SD0041 # 07 Y:1993 07 1993 INSTALL TIMERS AND/OR THERMOSTATS $22,031 $300 Not Implemented
SD0041 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $735 $1,980 Implemented
SD0041 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,135 $700 Implemented
SD0041 # 04 Y:1993 04 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $17,058 $5,430 Implemented
SD0041 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,909 $0 Implemented
SD0041 # 02 Y:1993 02 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,042 $20 Implemented
SD0041 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $960 $1,377 Implemented
SD0038 # 05 Y:1992 05 1992 INSTALL SET-BACK TIMERS $750 $909 Not Implemented
SD0038 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,307 $950 Not Implemented