Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,142
matching recommendationsSIC | 346 | Metal Forgings And Stampings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0371 # 07 Y:2009 | 07 | 2009 | INSTALL OCCUPANCY SENSORS | $1,052 | $2,064 | Implemented |
SF0371 # 09 Y:2009 | 09 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,056 | $15,973 | Implemented |
SF0371 # 11 Y:2009 | 11 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,353 | $133,125 | Implemented |
UA0029 # 02 Y:2009 | 02 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $650 | $1,416 | Implemented |
UA0029 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,785 | $14,634 | Implemented |
UA0029 # 06 Y:2009 | 06 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,679 | $0 | Implemented |
UA0029 # 07 Y:2009 | 07 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,902 | $17,383 | Implemented |
MZ0029 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,075 | $43,400 | Implemented |
MZ0029 # 05 Y:2008 | 05 | 2008 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $6 | $20 | Implemented |
IA0430 # 03 Y:2008 | 03 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $388 | $19 | Implemented |
IA0430 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,111 | $411 | Implemented |
IA0430 # 07 Y:2008 | 07 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $648 | $1,617 | Implemented |
UD0786 # 01 Y:2008 | 01 | 2008 | AIR CONDITION ONLY SPACE NECESSARY | $33,340 | $66,680 | Implemented |
UD0786 # 02 Y:2008 | 02 | 2008 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $16,751 | $15,000 | Implemented |
UD0786 # 03 Y:2008 | 03 | 2008 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $8,467 | $5,000 | Implemented |
UD0786 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,109 | $9,240 | Implemented |
UD0786 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,446 | $0 | Implemented |
UD0786 # 06 Y:2008 | 06 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,387 | $1,280 | Implemented |
UD0786 # 09 Y:2008 | 09 | 2008 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,154 | $0 | Implemented |
UD0786 # 11 Y:2008 | 11 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $303 | $1,000 | Implemented |
MA0628 # 01 Y:2008 | 01 | 2008 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $10,924 | $18,000 | Implemented |
MA0628 # 02 Y:2008 | 02 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,555 | $2,800 | Implemented |
MA0628 # 03 Y:2008 | 03 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,591 | $4,000 | Implemented |
MA0628 # 05 Y:2008 | 05 | 2008 | INSULATE BARE EQUIPMENT | $305 | $290 | Implemented |
UD0770 # 01 Y:2007 | 01 | 2007 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $309,378 | $0 | Implemented |