IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0641 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,810 $5,000 Implemented
TN0641 # 03 Y:1998 03 1998 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $3,560 $2,500 Implemented
TN0641 # 04 Y:1998 04 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,130 $980 Implemented
TN0538 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,115 $253 Implemented
TN0538 # 01 Y:1995 01 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,201 $0 Implemented
TN0538 # 06 Y:1995 06 1995 OPTIMIZE PLANT POWER FACTOR $4,892 $5,000 Implemented
TN0491 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $991 $320 Implemented
TN0491 # 05 Y:1993 05 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $504 $320 Implemented
TN0491 # 02 Y:1993 02 1993 INSTALL TIMERS AND/OR THERMOSTATS $1,810 $2,260 Implemented
TN0341 # 07 Y:1988 07 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $429 $1,600 Implemented
TN0341 # 02 Y:1988 02 1988 INSTALL TIMERS AND/OR THERMOSTATS $1,849 $128 Implemented
TN0341 # 05 Y:1988 05 1988 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $2,054 $0 Implemented
TN0324 # 09 Y:1987 09 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $790 $192 Implemented
TN0324 # 01 Y:1987 01 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,756 $300 Implemented
TN0324 # 02 Y:1987 02 1987 RECOVER WASTE HEAT FROM EQUIPMENT $906 $585 Implemented
TN0324 # 03 Y:1987 03 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,612 $4,800 Implemented
TN0324 # 05 Y:1987 05 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,322 $1,120 Implemented
TN0324 # 06 Y:1987 06 1987 ADJUST VENTS TO MINIMIZE ENERGY USE $967 $0 Implemented
TN0324 # 08 Y:1987 08 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $822 $1,360 Implemented
TN0247 # 03 Y:1985 03 1985 INSULATE BARE EQUIPMENT $808 $500 Implemented
TN0247 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,753 $135 Implemented
TN0247 # 01 Y:1985 01 1985 REDESIGN PROCESS $8,108 $2,000 Implemented