IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0482 # 04 Y:2001 04 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $990 $370 Implemented
CO0482 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,100 $210 Implemented
CO0482 # 06 Y:2001 06 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $310 $60 Implemented
CO0465 # 06 Y:2000 06 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $4,090 $7,960 Implemented
CO0465 # 05 Y:2000 05 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $750 $350 Implemented
CO0465 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,350 $400 Implemented
CO0465 # 03 Y:2000 03 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,240 $1,210 Implemented
CO0130 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $406 $0 Implemented
CO0130 # 09 Y:1988 09 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,162 $992 Implemented
CO0130 # 08 Y:1988 08 1988 INSULATE BARE EQUIPMENT $1,046 $200 Implemented
CO0130 # 07 Y:1988 07 1988 DIRECT WARMEST AIR TO COMBUSTION INTAKE $185 $200 Implemented
CO0130 # 06 Y:1988 06 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $744 $200 Implemented
CO0130 # 05 Y:1988 05 1988 COVER OPEN TANKS $1,520 $300 Implemented
CO0130 # 03 Y:1988 03 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,197 $200 Implemented
CO0130 # 01 Y:1988 01 1988 RECOVER AND REUSE COOLING WATER $4,097 $12,000 Implemented
CO0121 # 07 Y:1988 07 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,509 $1,517 Implemented
CO0121 # 06 Y:1988 06 1988 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,817 $250 Implemented
CO0121 # 05 Y:1988 05 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $567 $500 Implemented
CO0121 # 04 Y:1988 04 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,341 $2,000 Implemented
CO0121 # 01 Y:1988 01 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,482 $2,800 Implemented
CO0109 # 02 Y:1987 02 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $573 $540 Implemented
CO0109 # 07 Y:1987 07 1987 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $12,647 $2,000 Implemented
CO0109 # 06 Y:1987 06 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,069 $500 Implemented
CO0109 # 05 Y:1987 05 1987 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,517 $250 Implemented
CO0109 # 04 Y:1987 04 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,672 $45 Implemented