IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

310

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0251 # 05 Y:1996 05 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $409 $850 n/a
ND0251 # 06 Y:1996 06 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,312 $300 n/a
ND0251 # 07 Y:1996 07 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,969 $4,450 n/a
ND0251 # 08 Y:1996 08 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $39 $60 n/a
ND0251 # 09 Y:1996 09 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,292 $360 n/a
ND0251 # 10 Y:1996 10 1996 RECOVER WASTE HEAT FROM EQUIPMENT $2,510 $360 n/a
ND0251 # 11 Y:1996 11 1996 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $18,549 $660 n/a
UM0058 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,573 $3,037 Implemented
UM0058 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $885 $3,074 Implemented
UM0058 # 03 Y:1996 03 1996 OPTIMIZE PLANT POWER FACTOR $21,041 $15,570 Not Implemented
UM0058 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $689 $1,200 Implemented
UM0058 # 05 Y:1996 05 1996 USE SYNTHETIC LUBRICANT $830 $960 Not Implemented
UM0058 # 06 Y:1996 06 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,326 $0 Not Implemented
UM0058 # 07 Y:1996 07 1996 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,439 $24,000 Not Implemented
UM0058 # 08 Y:1996 08 1996 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $3,480 $1,200 Not Implemented
UM0055 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $5,129 $17,603 Not Implemented
UM0055 # 02 Y:1996 02 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,553 $4,800 Not Implemented
UM0055 # 03 Y:1996 03 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,921 $4,266 Not Implemented
UM0055 # 04 Y:1996 04 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,733 $18,000 Not Implemented
UM0055 # 05 Y:1996 05 1996 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $11,025 $680 Not Implemented
UM0042 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,315 $12,150 n/a
UM0042 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,676 $21,703 n/a
UM0042 # 03 Y:1995 03 1995 OPTIMIZE PLANT POWER FACTOR $27,333 $85,000 n/a
UM0042 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,959 $350 n/a
UM0042 # 05 Y:1995 05 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $8,994 $2,960 n/a