Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
81
matching recommendationsSIC | 346 | Metal Forgings And Stampings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0538 # 05 Y:1995 | 05 | 1995 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $218 | $435 | Not Implemented |
TN0538 # 06 Y:1995 | 06 | 1995 | OPTIMIZE PLANT POWER FACTOR | $4,892 | $5,000 | Implemented |
TN0538 # 02 Y:1995 | 02 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,149 | $0 | Not Implemented |
TN0538 # 01 Y:1995 | 01 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,201 | $0 | Implemented |
TN0491 # 05 Y:1993 | 05 | 1993 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $504 | $320 | Implemented |
TN0491 # 07 Y:1993 | 07 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $158 | $520 | Not Implemented |
TN0491 # 06 Y:1993 | 06 | 1993 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $201 | $560 | Not Implemented |
TN0491 # 04 Y:1993 | 04 | 1993 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $488 | $0 | Not Implemented |
TN0491 # 03 Y:1993 | 03 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $991 | $320 | Implemented |
TN0491 # 02 Y:1993 | 02 | 1993 | INSTALL TIMERS AND/OR THERMOSTATS | $1,810 | $2,260 | Implemented |
TN0491 # 01 Y:1993 | 01 | 1993 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,084 | $3,680 | Not Implemented |
TN0341 # 05 Y:1988 | 05 | 1988 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $2,054 | $0 | Implemented |
TN0341 # 07 Y:1988 | 07 | 1988 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $429 | $1,600 | Implemented |
TN0341 # 06 Y:1988 | 06 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,646 | $765 | Not Implemented |
TN0341 # 04 Y:1988 | 04 | 1988 | IMPROVE LUBRICATION PRACTICES | $2,195 | $1,650 | Not Implemented |
TN0341 # 03 Y:1988 | 03 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,137 | $1,750 | Not Implemented |
TN0341 # 02 Y:1988 | 02 | 1988 | INSTALL TIMERS AND/OR THERMOSTATS | $1,849 | $128 | Implemented |
TN0341 # 01 Y:1988 | 01 | 1988 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $7,301 | $11,508 | Not Implemented |
TN0324 # 08 Y:1987 | 08 | 1987 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $822 | $1,360 | Implemented |
TN0324 # 10 Y:1987 | 10 | 1987 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $139 | $45 | Not Implemented |
TN0324 # 01 Y:1987 | 01 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,756 | $300 | Implemented |
TN0324 # 02 Y:1987 | 02 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $906 | $585 | Implemented |
TN0324 # 03 Y:1987 | 03 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,612 | $4,800 | Implemented |
TN0324 # 04 Y:1987 | 04 | 1987 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,386 | $2,836 | Not Implemented |
TN0324 # 05 Y:1987 | 05 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,322 | $1,120 | Implemented |