IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

140

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0630 # 07 Y:2001 07 2001 INSULATE BARE EQUIPMENT $611 $1,180 Implemented
UD0630 # 08 Y:2001 08 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $300 $0 Not Implemented
UM0192 # 01 Y:2001 01 2001 OPTIMIZE PLANT POWER FACTOR $27,600 $7,600 Implemented
UM0192 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,649 $10,474 Not Implemented
UM0192 # 03 Y:2001 03 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,341 $800 Implemented
UM0192 # 04 Y:2001 04 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,130 $3,850 Implemented
UM0192 # 05 Y:2001 05 2001 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $700 $700 Implemented
UM0192 # 06 Y:2001 06 2001 RECOVER AND REUSE WASTE MATERIAL $21,000 $20,000 Implemented
LM0016 # 01 Y:2001 01 2001 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $9,494 $2,500 Not Implemented
LM0016 # 02 Y:2001 02 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $50,600 $60,000 Not Implemented
LM0016 # 03 Y:2001 03 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,311 $3,335 Implemented
LM0016 # 04 Y:2001 04 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $18,720 $15,300 n/a
LM0016 # 05 Y:2001 05 2001 $1,482,000 $5,000 Implemented
LM0016 # 06 Y:2001 06 2001 $340,000 $310,000 Implemented
SD0283 # 01 Y:2001 01 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,925 $144,000 Not Implemented
SD0283 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,393 $480 Implemented
SD0283 # 03 Y:2001 03 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,243 $6,000 Not Implemented
SD0283 # 04 Y:2001 04 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,566 $5,950 Not Implemented
SD0283 # 05 Y:2001 05 2001 INSTALL SKYLIGHTS $9,916 $28,500 Not Implemented
SD0283 # 06 Y:2001 06 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $17,992 $2,300 Implemented
SD0283 # 07 Y:2001 07 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $9,044 $18,000 Implemented
SD0283 # 08 Y:2001 08 2001 $476,943 $325,000 Not Implemented
SD0283 # 09 Y:2001 09 2001 $385,010 $152,000 Not Implemented
SD0283 # 10 Y:2001 10 2001 $2,622,000 $180,000 Not Implemented
SD0283 # 11 Y:2001 11 2001 $110,362 $400,000 Not Implemented