IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,590

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0286 # 09 Y:2001 09 2001 USE HIGH PRESSURE WASH SYSTEMS $41,558 $175,800 Not Implemented
UF0286 # 10 Y:2001 10 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,165 $5,237 Not Implemented
OR0395 # 01 Y:2001 01 2001 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE $23,700 $0 Implemented
OR0395 # 02 Y:2001 02 2001 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $367,000 $2,750,000 Not Implemented
OR0395 # 03 Y:2001 03 2001 USE PHOTOCELL CONTROLS $19,090 $5,610 Implemented
OR0395 # 04 Y:2001 04 2001 REPROCESS SPENT OILS ON SITE FOR RE-USE $12,795 $37,900 Not Implemented
OR0395 # 05 Y:2001 05 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,155 $25,870 Implemented
IC0014 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,265 $1,530 Implemented
IC0014 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $160 $150 Not Implemented
IC0014 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $444 $968 Not Implemented
IC0014 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,536 $9,420 Not Implemented
IC0014 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $857 $907 Not Implemented
IC0014 # 06 Y:2001 06 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $12,728 $6,351 Implemented
IC0014 # 07 Y:2001 07 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $1,980 $5,760 Implemented
UD0631 # 01 Y:2001 01 2001 $324,000 $1,600,000 Implemented
UD0631 # 02 Y:2001 02 2001 $708,750 $350,000 Implemented
UD0631 # 03 Y:2001 03 2001 $162,000 $48,000 Implemented
UD0631 # 04 Y:2001 04 2001 $19,834 $12,680 Not Implemented
UD0631 # 05 Y:2001 05 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,067 $7,000 Not Implemented
UD0631 # 06 Y:2001 06 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,670 $3,680 Implemented
UD0631 # 07 Y:2001 07 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,361 $588 Not Implemented
UD0631 # 08 Y:2001 08 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,800 $960 Implemented
UD0631 # 09 Y:2001 09 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,671 $0 Implemented
UD0631 # 10 Y:2001 10 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $904 $0 Not Implemented
UD0631 # 11 Y:2001 11 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $797 $1,168 Not Implemented