IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,616

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0025 # 05 Y:2002 05 2002 AUTOMATE PAYROLL SYSTEM $6,200 $3,260 Implemented
IC0025 # 06 Y:2002 06 2002 CLEAR AND RENT EXISTING SPACE $19,000 $765 Implemented
LM0023 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,237 $500 Implemented
LM0023 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,782 $2,200 Not Implemented
LM0023 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,630 $5,105 Not Implemented
LM0023 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,621 $2,611 Not Implemented
LM0023 # 05 Y:2002 05 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,241 $650 Not Implemented
LM0023 # 06 Y:2002 06 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $17,080 $3,200 Implemented
LM0023 # 07 Y:2002 07 2002 SCHEDULE DELIVERIES ACCORDING TO DEMAND $80,000 $21,770 Implemented
LM0023 # 08 Y:2002 08 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $3,330 $5,000 Implemented
LM0023 # 09 Y:2002 09 2002 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME $47,000 $2,000 Not Implemented
LM0023 # 10 Y:2002 10 2002 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $34,667 $7,348 Implemented
IC0022 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,251 $12,135 Not Implemented
IC0022 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,542 $2,500 Implemented
IC0022 # 03 Y:2001 03 2001 INSTALL SET-BACK TIMERS $5,334 $820 Not Implemented
IC0022 # 04 Y:2001 04 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,800 $3,280 Not Implemented
IC0022 # 05 Y:2001 05 2001 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $6,502 $6,300 Not Implemented
IC0022 # 06 Y:2001 06 2001 AUTOMATE PAYROLL SYSTEM $15,200 $4,900 Implemented
UF0286 # 01 Y:2001 01 2001 INSTALL OCCUPANCY SENSORS $1,664 $805 Not Implemented
UF0286 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,182 $410 Implemented
UF0286 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,194 $0 Not Implemented
UF0286 # 04 Y:2001 04 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $16,196 $19,500 Not Implemented
UF0286 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,470 $8,362 Implemented
UF0286 # 06 Y:2001 06 2001 ADD AREA LIGHTING SWITCHES $648 $232 Implemented
UF0286 # 07 Y:2001 07 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,353 $15,176 Not Implemented