Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,616
matching recommendationsSIC | 346 | Metal Forgings And Stampings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0286 # 08 Y:2001 | 08 | 2001 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,201 | $30,000 | Implemented |
UF0286 # 09 Y:2001 | 09 | 2001 | USE HIGH PRESSURE WASH SYSTEMS | $41,558 | $175,800 | Not Implemented |
UF0286 # 10 Y:2001 | 10 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,165 | $5,237 | Not Implemented |
OR0395 # 01 Y:2001 | 01 | 2001 | OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE | $23,700 | $0 | Implemented |
OR0395 # 02 Y:2001 | 02 | 2001 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $367,000 | $2,750,000 | Not Implemented |
OR0395 # 03 Y:2001 | 03 | 2001 | USE PHOTOCELL CONTROLS | $19,090 | $5,610 | Implemented |
OR0395 # 04 Y:2001 | 04 | 2001 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $12,795 | $37,900 | Not Implemented |
OR0395 # 05 Y:2001 | 05 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,155 | $25,870 | Implemented |
IC0014 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,265 | $1,530 | Implemented |
IC0014 # 02 Y:2001 | 02 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $160 | $150 | Not Implemented |
IC0014 # 03 Y:2001 | 03 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $444 | $968 | Not Implemented |
IC0014 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,536 | $9,420 | Not Implemented |
IC0014 # 05 Y:2001 | 05 | 2001 | INSTALL OCCUPANCY SENSORS | $857 | $907 | Not Implemented |
IC0014 # 06 Y:2001 | 06 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $12,728 | $6,351 | Implemented |
IC0014 # 07 Y:2001 | 07 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,980 | $5,760 | Implemented |
WV0223 # 01 Y:2001 | 01 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,194 | $1,000 | Not Implemented |
WV0223 # 02 Y:2001 | 02 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,692 | $300 | Implemented |
WV0223 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,270 | $124 | Implemented |
WV0223 # 04 Y:2001 | 04 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,630 | $386 | Not Implemented |
WV0223 # 05 Y:2001 | 05 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,635 | $1,344 | Implemented |
WV0223 # 06 Y:2001 | 06 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,567 | $44 | Implemented |
WV0223 # 07 Y:2001 | 07 | 2001 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $13,680 | $220 | Implemented |
WV0223 # 08 Y:2001 | 08 | 2001 | INSTALL EQUIPMENT TO MOVE PRODUCT | $92,576 | $12,000 | Not Implemented |
WV0223 # 09 Y:2001 | 09 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $216,000 | $400,000 | Not Implemented |
LM0018 # 01 Y:2001 | 01 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,902 | $8,000 | Not Implemented |