Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,616
matching recommendationsSIC | 346 | Metal Forgings And Stampings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0222 # 08 Y:2001 | 08 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,491 | $44 | Implemented |
WV0222 # 09 Y:2001 | 09 | 2001 | BURN WASTE OIL FOR HEAT | $2,857 | $3,172 | Not Implemented |
WV0222 # 10 Y:2001 | 10 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,376 | $1,528 | Not Implemented |
WV0222 # 11 Y:2001 | 11 | 2001 | RECYCLE FLUORESCENT LAMPS | $3,390 | $352 | Implemented |
WV0222 # 12 Y:2001 | 12 | 2001 | $45,760 | $5,000 | Implemented | |
WV0222 # 13 Y:2001 | 13 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $15,000 | $332 | Implemented |
UD0630 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,607 | $720 | Implemented |
UD0630 # 02 Y:2001 | 02 | 2001 | OPTIMIZE PLANT POWER FACTOR | $11,232 | $5,000 | Implemented |
UD0630 # 03 Y:2001 | 03 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,449 | $560 | Implemented |
UD0630 # 04 Y:2001 | 04 | 2001 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $3,432 | $700 | Not Implemented |
UD0630 # 05 Y:2001 | 05 | 2001 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $2,639 | $500 | Implemented |
UD0630 # 06 Y:2001 | 06 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,272 | $88 | Implemented |
UD0630 # 07 Y:2001 | 07 | 2001 | INSULATE BARE EQUIPMENT | $611 | $1,180 | Implemented |
UD0630 # 08 Y:2001 | 08 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $300 | $0 | Not Implemented |
UM0192 # 01 Y:2001 | 01 | 2001 | OPTIMIZE PLANT POWER FACTOR | $27,600 | $7,600 | Implemented |
UM0192 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,649 | $10,474 | Not Implemented |
UM0192 # 03 Y:2001 | 03 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,341 | $800 | Implemented |
UM0192 # 04 Y:2001 | 04 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,130 | $3,850 | Implemented |
UM0192 # 05 Y:2001 | 05 | 2001 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $700 | $700 | Implemented |
UM0192 # 06 Y:2001 | 06 | 2001 | RECOVER AND REUSE WASTE MATERIAL | $21,000 | $20,000 | Implemented |
LM0016 # 01 Y:2001 | 01 | 2001 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $9,494 | $2,500 | Not Implemented |
LM0016 # 02 Y:2001 | 02 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $50,600 | $60,000 | Not Implemented |
LM0016 # 03 Y:2001 | 03 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,311 | $3,335 | Implemented |
LM0016 # 04 Y:2001 | 04 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $18,720 | $15,300 | n/a |
LM0016 # 05 Y:2001 | 05 | 2001 | DEVELOP STANDARD OPERATING PROCEDURES | $1,482,000 | $5,000 | Implemented |