IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,616

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0221 # 07 Y:1999 07 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $21,965 $59,400 Not Implemented
IA0221 # 08 Y:1999 08 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $20,642 $11,793 Implemented
HO0204 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,583 $16,842 Implemented
HO0204 # 02 Y:1999 02 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $901 $0 Implemented
HO0204 # 03 Y:1999 03 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $393 $492 Not Implemented
HO0204 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,928 $2,000 Not Implemented
HO0204 # 05 Y:1999 05 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $1,517 $1,424 Not Implemented
HO0204 # 06 Y:1999 06 1999 INSULATE FEEDWATER TANK $526 $438 Implemented
HO0204 # 07 Y:1999 07 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,911 $2,450 Implemented
HO0204 # 08 Y:1999 08 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,470 $483 Not Implemented
HO0204 # 09 Y:1999 09 1999 ELIMINATE SHUTDOWNS OF CONTROLS DUE TO OVERHEATING $5,342 $1,760 Not Implemented
HO0204 # 10 Y:1999 10 1999 MAINTAIN/ENLARGE A STOCK OF SPARE PARTS $1,125 $318 Implemented
HO0204 # 11 Y:1999 11 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $600 $250 Not Implemented
HO0204 # 12 Y:1999 12 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $6,410 $1,424 Not Implemented
HO0204 # 13 Y:1999 13 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,250 $120 Implemented
HO0204 # 14 Y:1999 14 1999 MINIMIZE WATER USAGE $1,129 $600 Not Implemented
MS0133 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,085 $881 Implemented
MS0133 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,403 $360 Not Implemented
MS0133 # 03 Y:1999 03 1999 INSTALL TIMERS AND/OR THERMOSTATS $534 $236 Implemented
MS0133 # 04 Y:1999 04 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,791 $5,795 Not Implemented
MS0133 # 05 Y:1999 05 1999 BURN WASTE OIL FOR HEAT $12,299 $16,435 Not Implemented
MS0133 # 06 Y:1999 06 1999 $48,956 $6,286 Implemented
MA0442 # 01 Y:1999 01 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $186,395 $900,000 Not Implemented
MA0442 # 02 Y:1999 02 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $73,450 $125,600 Not Implemented
MA0442 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $19,396 $38,500 Implemented