IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

310

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0226 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,111 $375 Not Implemented
UM0226 # 07 Y:2003 07 2003 OPTIMIZE PLANT POWER FACTOR $2,055 $1,560 Not Implemented
UM0226 # 08 Y:2003 08 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,722 $1,000 Not Implemented
UM0226 # 09 Y:2003 09 2003 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $1,207 $600 Not Implemented
UM0226 # 10 Y:2003 10 2003 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $724 $400 Not Implemented
UM0226 # 11 Y:2003 11 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,004 $2,200 Not Implemented
UM0226 # 12 Y:2003 12 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $164 $0 Not Implemented
UM0225 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,181 $750 Not Implemented
UM0225 # 02 Y:2003 02 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,809 $5,500 Not Implemented
UM0225 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,040 $6,081 Not Implemented
UM0225 # 04 Y:2003 04 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,500 $4,000 Not Implemented
UM0225 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $80 $0 Not Implemented
UM0192 # 01 Y:2001 01 2001 OPTIMIZE PLANT POWER FACTOR $27,600 $7,600 Implemented
UM0192 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,649 $10,474 Not Implemented
UM0192 # 03 Y:2001 03 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,341 $800 Implemented
UM0192 # 04 Y:2001 04 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,130 $3,850 Implemented
UM0192 # 05 Y:2001 05 2001 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $700 $700 Implemented
UM0192 # 06 Y:2001 06 2001 RECOVER AND REUSE WASTE MATERIAL $21,000 $20,000 Implemented
UM0170 # 01 Y:2000 01 2000 INSTALL OCCUPANCY SENSORS $709 $1,660 Implemented
UM0170 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,147 $500 Implemented
UM0170 # 03 Y:2000 03 2000 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $185,532 $310,000 Not Implemented
UM0170 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $64,245 $22,000 Not Implemented
UM0170 # 05 Y:2000 05 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $11,573 $8,200 Not Implemented
UM0151 # 01 Y:1999 01 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $533 $542 Implemented
UM0151 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,156 $1,000 Implemented