IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

310

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0151 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,404 $1,425 Implemented
UM0151 # 04 Y:1999 04 1999 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $5,903 $11,000 Implemented
UM0151 # 05 Y:1999 05 1999 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $13,689 $960 Not Implemented
UM0120 # 01 Y:1998 01 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,335 $250 Not Implemented
UM0120 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,860 $1,000 Implemented
UM0120 # 03 Y:1998 03 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,029 $1,000 Implemented
UM0120 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,783 $100 Implemented
UM0120 # 05 Y:1998 05 1998 RECOVER WASTE HEAT FROM EQUIPMENT $962 $1,500 Not Implemented
UM0120 # 06 Y:1998 06 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $14,994 $5,000 Not Implemented
UM0120 # 07 Y:1998 07 1998 IMPROVE SPACE COMFORT CONDITIONING $1,440 $518 Implemented
UM0119 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,067 $11,283 Implemented
UM0119 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,659 $30,946 Not Implemented
UM0119 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,816 $1,800 Not Implemented
UM0119 # 04 Y:1998 04 1998 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $24,125 $3,800 Not Implemented
UM0119 # 05 Y:1998 05 1998 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $200 $132 Not Implemented
UM0119 # 06 Y:1998 06 1998 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $2,707 $11,000 Not Implemented
UM0119 # 07 Y:1998 07 1998 EXPAND OPERATIONS INTO UNUSED SPACE $319,544 $0 Not Implemented
UM0115 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $204 $303 Implemented
UM0115 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,764 $6,186 Not Implemented
UM0115 # 03 Y:1998 03 1998 OPTIMIZE PLANT POWER FACTOR $888 $804 Implemented
UM0115 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $410 $600 Not Implemented
UM0115 # 05 Y:1998 05 1998 RECOVER AND REUSE WASTE MATERIAL $1,040 $500 Implemented
UM0115 # 06 Y:1998 06 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $510 $0 Implemented
UM0115 # 07 Y:1998 07 1998 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $7,650 $1,500 Implemented
UM0112 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $852 $1,450 Implemented