Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
140
matching recommendationsSIC | 346 | Metal Forgings And Stampings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0022 # 04 Y:2001 | 04 | 2001 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,800 | $3,280 | Not Implemented |
IC0022 # 03 Y:2001 | 03 | 2001 | INSTALL SET-BACK TIMERS | $5,334 | $820 | Not Implemented |
IC0022 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,251 | $12,135 | Not Implemented |
IC0022 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,542 | $2,500 | Implemented |
IC0022 # 06 Y:2001 | 06 | 2001 | AUTOMATE PAYROLL SYSTEM | $15,200 | $4,900 | Implemented |
IC0022 # 05 Y:2001 | 05 | 2001 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $6,502 | $6,300 | Not Implemented |
UF0286 # 01 Y:2001 | 01 | 2001 | INSTALL OCCUPANCY SENSORS | $1,664 | $805 | Not Implemented |
UF0286 # 07 Y:2001 | 07 | 2001 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $5,353 | $15,176 | Not Implemented |
UF0286 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,182 | $410 | Implemented |
UF0286 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,194 | $0 | Not Implemented |
UF0286 # 04 Y:2001 | 04 | 2001 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $16,196 | $19,500 | Not Implemented |
UF0286 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,470 | $8,362 | Implemented |
UF0286 # 09 Y:2001 | 09 | 2001 | USE HIGH PRESSURE WASH SYSTEMS | $41,558 | $175,800 | Not Implemented |
UF0286 # 06 Y:2001 | 06 | 2001 | ADD AREA LIGHTING SWITCHES | $648 | $232 | Implemented |
UF0286 # 08 Y:2001 | 08 | 2001 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,201 | $30,000 | Implemented |
UF0286 # 10 Y:2001 | 10 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,165 | $5,237 | Not Implemented |
OR0395 # 01 Y:2001 | 01 | 2001 | OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE | $23,700 | $0 | Implemented |
OR0395 # 02 Y:2001 | 02 | 2001 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $367,000 | $2,750,000 | Not Implemented |
OR0395 # 03 Y:2001 | 03 | 2001 | USE PHOTOCELL CONTROLS | $19,090 | $5,610 | Implemented |
OR0395 # 04 Y:2001 | 04 | 2001 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $12,795 | $37,900 | Not Implemented |
OR0395 # 05 Y:2001 | 05 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,155 | $25,870 | Implemented |
IC0014 # 02 Y:2001 | 02 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $160 | $150 | Not Implemented |
IC0014 # 03 Y:2001 | 03 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $444 | $968 | Not Implemented |
IC0014 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,536 | $9,420 | Not Implemented |
IC0014 # 05 Y:2001 | 05 | 2001 | INSTALL OCCUPANCY SENSORS | $857 | $907 | Not Implemented |