Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
727
matching recommendationsSIC | 3462 | Iron And Steel Forgings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LM0030 # 11 Y:2002 | 11 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $2,080 | $224 | Not Implemented |
LE0130 # 01 Y:2002 | 01 | 2002 | INSTALL OCCUPANCY SENSORS | $5,934 | $150 | Not Implemented |
LE0130 # 02 Y:2002 | 02 | 2002 | INSULATE BARE EQUIPMENT | $583 | $180 | Not Implemented |
LE0130 # 03 Y:2002 | 03 | 2002 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $2,040 | $0 | Implemented |
LE0130 # 04 Y:2002 | 04 | 2002 | IMPROVE COMBUSTION CONTROL CAPABILITY | $8,789 | $1,000 | Implemented |
LE0130 # 05 Y:2002 | 05 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $16,677 | $0 | Implemented |
LE0130 # 06 Y:2002 | 06 | 2002 | IMPROVE LUBRICATION PRACTICES | $7,373 | $400 | Not Implemented |
LE0130 # 07 Y:2002 | 07 | 2002 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $105,753 | $60,000 | Not Implemented |
UF0286 # 01 Y:2001 | 01 | 2001 | INSTALL OCCUPANCY SENSORS | $1,664 | $805 | Not Implemented |
UF0286 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,182 | $410 | Implemented |
UF0286 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,194 | $0 | Not Implemented |
UF0286 # 04 Y:2001 | 04 | 2001 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $16,196 | $19,500 | Not Implemented |
UF0286 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,470 | $8,362 | Implemented |
UF0286 # 06 Y:2001 | 06 | 2001 | ADD AREA LIGHTING SWITCHES | $648 | $232 | Implemented |
UF0286 # 07 Y:2001 | 07 | 2001 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $5,353 | $15,176 | Not Implemented |
UF0286 # 08 Y:2001 | 08 | 2001 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,201 | $30,000 | Implemented |
UF0286 # 09 Y:2001 | 09 | 2001 | USE HIGH PRESSURE WASH SYSTEMS | $41,558 | $175,800 | Not Implemented |
UF0286 # 10 Y:2001 | 10 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,165 | $5,237 | Not Implemented |
OR0395 # 01 Y:2001 | 01 | 2001 | OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE | $23,700 | $0 | Implemented |
OR0395 # 02 Y:2001 | 02 | 2001 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $367,000 | $2,750,000 | Not Implemented |
OR0395 # 03 Y:2001 | 03 | 2001 | USE PHOTOCELL CONTROLS | $19,090 | $5,610 | Implemented |
OR0395 # 04 Y:2001 | 04 | 2001 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $12,795 | $37,900 | Not Implemented |
OR0395 # 05 Y:2001 | 05 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,155 | $25,870 | Implemented |
IC0014 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,265 | $1,530 | Implemented |
IC0014 # 02 Y:2001 | 02 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $160 | $150 | Not Implemented |