Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsSIC | 3462 | Iron And Steel Forgings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0295 # 10 Y:2006 | 10 | 2006 | USE PHOTOCELL CONTROLS | $878 | $736 | Not Implemented |
UM0295 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $80,138 | $170,000 | Implemented |
UM0295 # 02 Y:2006 | 02 | 2006 | OPTIMIZE PLANT POWER FACTOR | $71,400 | $75,000 | Not Implemented |
UM0295 # 03 Y:2006 | 03 | 2006 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $15,365 | $1,130 | Not Implemented |
UM0295 # 04 Y:2006 | 04 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $10,656 | $5,250 | Not Implemented |
UM0295 # 05 Y:2006 | 05 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,859 | $2,400 | Not Implemented |
UM0295 # 06 Y:2006 | 06 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,040 | $1,200 | Implemented |
UM0295 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,767 | $13,877 | Not Implemented |
UM0295 # 08 Y:2006 | 08 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,259 | $3,080 | Not Implemented |
UM0295 # 09 Y:2006 | 09 | 2006 | INSULATE BARE EQUIPMENT | $1,316 | $1,860 | Not Implemented |
UM0170 # 05 Y:2000 | 05 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $11,573 | $8,200 | Not Implemented |
UM0170 # 04 Y:2000 | 04 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $64,245 | $22,000 | Not Implemented |
UM0170 # 03 Y:2000 | 03 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $185,532 | $310,000 | Not Implemented |
UM0170 # 02 Y:2000 | 02 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,147 | $500 | Implemented |
UM0170 # 01 Y:2000 | 01 | 2000 | INSTALL OCCUPANCY SENSORS | $709 | $1,660 | Implemented |
UM0042 # 05 Y:1995 | 05 | 1995 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $8,994 | $2,960 | n/a |
UM0042 # 06 Y:1995 | 06 | 1995 | INSULATE BARE EQUIPMENT | $7,633 | $2,650 | n/a |
UM0042 # 04 Y:1995 | 04 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,959 | $350 | n/a |
UM0042 # 03 Y:1995 | 03 | 1995 | OPTIMIZE PLANT POWER FACTOR | $27,333 | $85,000 | n/a |
UM0042 # 02 Y:1995 | 02 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,676 | $21,703 | n/a |
UM0042 # 01 Y:1995 | 01 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,315 | $12,150 | n/a |
ND0171 # 02 Y:1993 | 02 | 1993 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $17,072 | $60,040 | Not Implemented |
ND0171 # 01 Y:1993 | 01 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,964 | $4,533 | Not Implemented |
ND0171 # 03 Y:1993 | 03 | 1993 | OPTIMIZE PLANT POWER FACTOR | $12,500 | $22,673 | Not Implemented |
ND0171 # 04 Y:1993 | 04 | 1993 | HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS | $7,558 | $8,500 | Not Implemented |