IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

61

matching recommendations
Reset
SIC 3462 Iron And Steel Forgings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0286 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,182 $410 Implemented
UF0286 # 01 Y:2001 01 2001 INSTALL OCCUPANCY SENSORS $1,664 $805 Not Implemented
UF0286 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,194 $0 Not Implemented
UF0286 # 04 Y:2001 04 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $16,196 $19,500 Not Implemented
UF0286 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,470 $8,362 Implemented
UF0286 # 06 Y:2001 06 2001 ADD AREA LIGHTING SWITCHES $648 $232 Implemented
UF0286 # 07 Y:2001 07 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,353 $15,176 Not Implemented
UF0286 # 08 Y:2001 08 2001 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,201 $30,000 Implemented
UF0286 # 10 Y:2001 10 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,165 $5,237 Not Implemented
UF0286 # 09 Y:2001 09 2001 USE HIGH PRESSURE WASH SYSTEMS $41,558 $175,800 Not Implemented
OR0395 # 04 Y:2001 04 2001 REPROCESS SPENT OILS ON SITE FOR RE-USE $12,795 $37,900 Not Implemented
OR0395 # 01 Y:2001 01 2001 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE $23,700 $0 Implemented
OR0395 # 02 Y:2001 02 2001 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $367,000 $2,750,000 Not Implemented
OR0395 # 03 Y:2001 03 2001 USE PHOTOCELL CONTROLS $19,090 $5,610 Implemented
OR0395 # 05 Y:2001 05 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,155 $25,870 Implemented
IC0014 # 06 Y:2001 06 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $12,728 $6,351 Implemented
IC0014 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $857 $907 Not Implemented
IC0014 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,536 $9,420 Not Implemented
IC0014 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $444 $968 Not Implemented
IC0014 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $160 $150 Not Implemented
IC0014 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,265 $1,530 Implemented
IC0014 # 07 Y:2001 07 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $1,980 $5,760 Implemented
WV0223 # 06 Y:2001 06 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,567 $44 Implemented
WV0223 # 05 Y:2001 05 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,635 $1,344 Implemented
WV0223 # 01 Y:2001 01 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,194 $1,000 Not Implemented