Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsSIC | 3462 | Iron And Steel Forgings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0236 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,401 | $1,650 | Implemented |
MZ0236 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,327 | $175 | Implemented |
MZ0236 # 04 Y:2017 | 04 | 2017 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,559 | $846 | Not Implemented |
MZ0236 # 05 Y:2017 | 05 | 2017 | INSTALL OCCUPANCY SENSORS | $323 | $746 | Implemented |
MZ0236 # 01 Y:2017 | 01 | 2017 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $19,789 | $1,000 | Implemented |
SU0444 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $145 | $165 | Not Implemented |
SU0444 # 07 Y:2017 | 07 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $119 | $563 | Implemented |
SU0444 # 06 Y:2017 | 06 | 2017 | UPGRADE OBSOLETE EQUIPMENT | $162 | $556 | Implemented |
SU0444 # 05 Y:2017 | 05 | 2017 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $25,853 | $72,576 | Not Implemented |
SU0444 # 03 Y:2017 | 03 | 2017 | ELIMINATE/REDUCE AN OPERATION | $1,675 | $1,780 | Implemented |
SU0444 # 02 Y:2017 | 02 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $527 | $439 | Not Implemented |
SU0444 # 01 Y:2017 | 01 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,081 | $0 | Implemented |
UK1614 # 01 Y:2017 | 01 | 2017 | OPTIMIZE PLANT POWER FACTOR | $132,318 | $126,876 | Implemented |
UK1614 # 09 Y:2017 | 09 | 2017 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $823 | $0 | Not Implemented |
UK1614 # 08 Y:2017 | 08 | 2017 | USE ONLY CERTIFIED MOTOR REPAIR SHOPS | $1,614 | $4,335 | Implemented |
UK1614 # 07 Y:2017 | 07 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $552 | $318 | Not Implemented |
UK1614 # 06 Y:2017 | 06 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $895 | $0 | Not Implemented |
UK1614 # 05 Y:2017 | 05 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,465 | $1,800 | Not Implemented |
UK1614 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,502 | $20,641 | Implemented |
UK1614 # 03 Y:2017 | 03 | 2017 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,324 | $4,351 | Not Implemented |
UK1614 # 02 Y:2017 | 02 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $20,584 | $22,000 | Not Implemented |
UM0480 # 01 Y:2017 | 01 | 2017 | OPTIMIZE PLANT POWER FACTOR | $35,941 | $20,000 | n/a |
UM0480 # 02 Y:2017 | 02 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,908 | $2,500 | n/a |
UM0480 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,601 | $28,500 | n/a |
UM0480 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,087 | $6,000 | n/a |