IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 3462 Iron And Steel Forgings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0236 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,401 $1,650 Implemented
MZ0236 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,327 $175 Implemented
MZ0236 # 04 Y:2017 04 2017 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,559 $846 Not Implemented
MZ0236 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $323 $746 Implemented
MZ0236 # 01 Y:2017 01 2017 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $19,789 $1,000 Implemented
SU0444 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $145 $165 Not Implemented
SU0444 # 07 Y:2017 07 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $119 $563 Implemented
SU0444 # 06 Y:2017 06 2017 UPGRADE OBSOLETE EQUIPMENT $162 $556 Implemented
SU0444 # 05 Y:2017 05 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,853 $72,576 Not Implemented
SU0444 # 03 Y:2017 03 2017 ELIMINATE/REDUCE AN OPERATION $1,675 $1,780 Implemented
SU0444 # 02 Y:2017 02 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $527 $439 Not Implemented
SU0444 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,081 $0 Implemented
UK1614 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $132,318 $126,876 Implemented
UK1614 # 09 Y:2017 09 2017 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $823 $0 Not Implemented
UK1614 # 08 Y:2017 08 2017 USE ONLY CERTIFIED MOTOR REPAIR SHOPS $1,614 $4,335 Implemented
UK1614 # 07 Y:2017 07 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $552 $318 Not Implemented
UK1614 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $895 $0 Not Implemented
UK1614 # 05 Y:2017 05 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,465 $1,800 Not Implemented
UK1614 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,502 $20,641 Implemented
UK1614 # 03 Y:2017 03 2017 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,324 $4,351 Not Implemented
UK1614 # 02 Y:2017 02 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $20,584 $22,000 Not Implemented
UM0480 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $35,941 $20,000 n/a
UM0480 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,908 $2,500 n/a
UM0480 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,601 $28,500 n/a
UM0480 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,087 $6,000 n/a