IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

460

matching recommendations
Reset
SIC 3469 Metal Stampings, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0118 # 03 Y:1991 03 1991 COMBINE UTILITY METERS $2,430 $250 Implemented
AM0118 # 04 Y:1991 04 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $394 $507 Implemented
AM0118 # 05 Y:1991 05 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,670 $6,300 Implemented
AM0118 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,055 $1,030 Implemented
AM0118 # 07 Y:1991 07 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $990 $250 Implemented
AM0118 # 08 Y:1991 08 1991 IMPROVE LUBRICATION PRACTICES $590 $0 Implemented
AM0118 # 09 Y:1991 09 1991 RECOVER WASTE HEAT FROM EQUIPMENT $580 $200 Implemented
KU0335 # 01 Y:1991 01 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,716 $0 Implemented
KU0335 # 02 Y:1991 02 1991 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $6,430 $0 Implemented
KU0335 # 03 Y:1991 03 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,755 $1,500 Implemented
KU0335 # 04 Y:1991 04 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,018 $0 Implemented
KU0335 # 05 Y:1991 05 1991 INSTALL SET-BACK TIMERS $641 $300 Implemented
KU0335 # 06 Y:1991 06 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $590 $0 Implemented
KU0335 # 07 Y:1991 07 1991 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $369 $300 Implemented
KU0335 # 08 Y:1991 08 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $408 $388 Implemented
KU0334 # 01 Y:1991 01 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,153 $1,800 Implemented
KU0334 # 02 Y:1991 02 1991 SCHEDULE USE OF ELEVATORS TO CONSERVE ENERGY $336 $40 Implemented
KU0334 # 03 Y:1991 03 1991 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $22,062 $33,150 Implemented
KU0334 # 04 Y:1991 04 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,034 $4,200 Implemented
KU0334 # 05 Y:1991 05 1991 RECOVER WASTE HEAT FROM EQUIPMENT $6,382 $0 Implemented
KU0334 # 06 Y:1991 06 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,054 $16,950 Implemented
KU0334 # 07 Y:1991 07 1991 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $10,665 $22,600 Implemented
KU0334 # 08 Y:1991 08 1991 INSTALL SET-BACK TIMERS $454 $120 Implemented
WI0107 # 01 Y:1991 01 1991 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,375 $1,250 Implemented
WI0107 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,925 $2,980 Implemented