Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
967
matching recommendationsSIC | 3469 | Metal Stampings, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0022 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,542 | $2,500 | Implemented |
IC0022 # 03 Y:2001 | 03 | 2001 | INSTALL SET-BACK TIMERS | $5,334 | $820 | Not Implemented |
IC0022 # 04 Y:2001 | 04 | 2001 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,800 | $3,280 | Not Implemented |
IC0022 # 05 Y:2001 | 05 | 2001 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $6,502 | $6,300 | Not Implemented |
IC0022 # 06 Y:2001 | 06 | 2001 | AUTOMATE PAYROLL SYSTEM | $15,200 | $4,900 | Implemented |
UD0631 # 01 Y:2001 | 01 | 2001 | INSTALL EQUIPMENT TO MOVE PRODUCT | $324,000 | $1,600,000 | Implemented |
UD0631 # 02 Y:2001 | 02 | 2001 | DEVELOP STANDARD OPERATING PROCEDURES | $708,750 | $350,000 | Implemented |
UD0631 # 03 Y:2001 | 03 | 2001 | DEVELOP STANDARD OPERATING PROCEDURES | $162,000 | $48,000 | Implemented |
UD0631 # 04 Y:2001 | 04 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $19,834 | $12,680 | Not Implemented |
UD0631 # 05 Y:2001 | 05 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,067 | $7,000 | Not Implemented |
UD0631 # 06 Y:2001 | 06 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $9,670 | $3,680 | Implemented |
UD0631 # 07 Y:2001 | 07 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,361 | $588 | Not Implemented |
UD0631 # 08 Y:2001 | 08 | 2001 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $2,800 | $960 | Implemented |
UD0631 # 09 Y:2001 | 09 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,671 | $0 | Implemented |
UD0631 # 10 Y:2001 | 10 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $904 | $0 | Not Implemented |
UD0631 # 11 Y:2001 | 11 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $797 | $1,168 | Not Implemented |
UD0631 # 12 Y:2001 | 12 | 2001 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $534 | $680 | Not Implemented |
UD0631 # 13 Y:2001 | 13 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $421 | $688 | Implemented |
UD0630 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,607 | $720 | Implemented |
UD0630 # 02 Y:2001 | 02 | 2001 | OPTIMIZE PLANT POWER FACTOR | $11,232 | $5,000 | Implemented |
UD0630 # 03 Y:2001 | 03 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,449 | $560 | Implemented |
UD0630 # 04 Y:2001 | 04 | 2001 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $3,432 | $700 | Not Implemented |
UD0630 # 05 Y:2001 | 05 | 2001 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $2,639 | $500 | Implemented |
UD0630 # 06 Y:2001 | 06 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,272 | $88 | Implemented |
UD0630 # 07 Y:2001 | 07 | 2001 | INSULATE BARE EQUIPMENT | $611 | $1,180 | Implemented |