IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,294

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0219 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,069 $600 Implemented
ND0219 # 02 Y:1995 02 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,373 $200 Implemented
ND0219 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,443 $2,720 Implemented
ND0219 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,277 $1,180 Implemented
ND0219 # 05 Y:1995 05 1995 RECOVER AND REUSE WASTE MATERIAL $42,622 $50,000 Implemented
ND0219 # 06 Y:1995 06 1995 CONVERT TO ELECTROSTATIC POWDER COATING $17,600 $24,500 Implemented
AM0248 # 01 Y:1995 01 1995 INSULATE BARE EQUIPMENT $9,500 $2,930 Implemented
AM0248 # 03 Y:1995 03 1995 INSULATE BARE EQUIPMENT $1,020 $290 Implemented
AM0248 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $750 $200 Implemented
AM0248 # 05 Y:1995 05 1995 UPGRADE OBSOLETE EQUIPMENT $790 $655 Implemented
AM0248 # 06 Y:1995 06 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $350 $0 Implemented
AM0248 # 07 Y:1995 07 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $310 $500 Implemented
AM0248 # 08 Y:1995 08 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $38,980 $40,000 Implemented
AM0248 # 09 Y:1995 09 1995 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $8,550 $19,700 Implemented
AM0248 # 10 Y:1995 10 1995 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $340 $0 Implemented
WV0066 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $483 $0 Implemented
WV0066 # 01 Y:1995 01 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,127 $5,000 Implemented
MA0340 # 01 Y:1995 01 1995 USE POWER DURING OFF-PEAK PERIODS $4,800 $0 Implemented
MA0340 # 02 Y:1995 02 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,349 $200 Implemented
MA0340 # 04 Y:1995 04 1995 PAY UTILITY BILLS ON TIME $1,820 $0 Implemented
MA0340 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,369 $2,464 Implemented
MA0340 # 06 Y:1995 06 1995 REDUCE VENTILATION AIR $1,190 $3,320 Implemented
MA0340 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $753 $0 Implemented
MA0340 # 08 Y:1995 08 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $612 $330 Implemented
MA0340 # 10 Y:1995 10 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $356 $570 Implemented