IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,284

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0145 # 01 Y:1992 01 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $956 $0 Implemented
OR0145 # 02 Y:1992 02 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $824 $2,400 Implemented
OR0145 # 03 Y:1992 03 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $208 $1,764 Implemented
OR0145 # 04 Y:1992 04 1992 OPTIMIZE PLANT POWER FACTOR $1,373 $870 Implemented
OR0145 # 05 Y:1992 05 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $82 $1,625 Implemented
OR0145 # 06 Y:1992 06 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $360 $7,421 Implemented
OR0145 # 07 Y:1992 07 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $945 $4,741 Implemented
UD0369 # 02 Y:1992 02 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,020 $0 Implemented
UD0369 # 03 Y:1992 03 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,504 $0 Implemented
UD0369 # 04 Y:1992 04 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $850 $0 Implemented
UD0369 # 05 Y:1992 05 1992 RECOVER WASTE HEAT FROM EQUIPMENT $6,413 $300 Implemented
UD0369 # 07 Y:1992 07 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,842 $1,800 Implemented
OK0369 # 01 Y:1992 01 1992 OPTIMIZE PLANT POWER FACTOR $1,250 $990 Implemented
OK0369 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,038 $0 Implemented
OK0369 # 04 Y:1992 04 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $946 $0 Implemented
AM0135 # 01 Y:1991 01 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,330 $6,532 Implemented
AM0135 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $2,190 $100 Implemented
AM0135 # 03 Y:1991 03 1991 INCREASE AMOUNT OF CONDENSATE RETURNED $870 $715 Implemented
AM0135 # 04 Y:1991 04 1991 RECOVER WASTE HEAT FROM EQUIPMENT $840 $1,009 Implemented
AM0135 # 05 Y:1991 05 1991 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $630 $340 Implemented
AM0135 # 06 Y:1991 06 1991 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $440 $315 Implemented
AM0135 # 07 Y:1991 07 1991 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $320 $0 Implemented
AM0135 # 08 Y:1991 08 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $165 $0 Implemented
AM0135 # 09 Y:1991 09 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $120 $75 Implemented
CO0217 # 01 Y:1991 01 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,147 $1,550 Implemented