IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,294

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0211 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,829 $4,500 Implemented
IC0211 # 05 Y:2019 05 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $36,922 $0 Implemented
AM0771 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,590 $8,175 Implemented
AM0771 # 02 Y:2019 02 2019 REPLACE BOILER $8,200 $42,760 Implemented
AM0771 # 03 Y:2019 03 2019 OPTIMIZE PLANT POWER FACTOR $6,400 $12,960 Implemented
AM0771 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,500 $1,340 Implemented
AM0771 # 06 Y:2019 06 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $300 $26 Implemented
IP0112 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,973 $5 Implemented
IP0112 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,835 $130 Implemented
IP0112 # 05 Y:2019 05 2019 USE PHOTOCELL CONTROLS $403 $35 Implemented
IP0112 # 06 Y:2019 06 2019 INSTALL OCCUPANCY SENSORS $21,079 $3,360 Implemented
IP0112 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,905 $5,340 Implemented
IP0112 # 09 Y:2019 09 2019 INSULATE BARE EQUIPMENT $674 $945 Implemented
IP0112 # 10 Y:2019 10 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,070 $21,274 Implemented
IP0112 # 11 Y:2019 11 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,283 $30,250 Implemented
IP0111 # 01 Y:2018 01 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,378 $0 Implemented
IP0111 # 09 Y:2018 09 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $180 $679 Implemented
IP0111 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $1,101 $893 Implemented
IP0111 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $780 $217 Implemented
IP0110 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,973 $5 Implemented
IP0110 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,835 $130 Implemented
IP0110 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $21,079 $3,360 Implemented
IP0110 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,905 $5,340 Implemented
IP0110 # 08 Y:2018 08 2018 INSULATE BARE EQUIPMENT $655 $945 Implemented
IP0110 # 09 Y:2018 09 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,070 $21,274 Implemented