IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

99

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0468 # 04 Y:2016 04 2016 INSULATE BARE EQUIPMENT $3,084 $2,000 Implemented
UM0468 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $1,588 $1,500 Implemented
UM0468 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,125 $43,167 Implemented
UM0444 # 04 Y:2014 04 2014 USE MINIMUM STEAM OPERATING PRESSURE $6,638 $5,000 Implemented
UM0428 # 05 Y:2013 05 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,177 $9,000 Implemented
UM0428 # 02 Y:2013 02 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,106 $1,500 Implemented
UM0428 # 04 Y:2013 04 2013 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $636 $1,200 Implemented
UM0428 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $990 $100 Implemented
UM0376 # 08 Y:2010 08 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $248 $10 Implemented
UM0376 # 10 Y:2010 10 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $582 $6,500 Implemented
UM0376 # 07 Y:2010 07 2010 OPTIMIZE PLANT POWER FACTOR $2,850 $2,850 Implemented
UM0376 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,126 $2,000 Implemented
UM0376 # 03 Y:2010 03 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,381 $9,416 Implemented
UM0376 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,793 $200 Implemented
UM0376 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,012 $6,547 Implemented
UM0376 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $7,625 $250 Implemented
UM0376 # 09 Y:2010 09 2010 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,943 $2,800 Implemented
UM0376 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,368 $36,732 Implemented
UM0366 # 05 Y:2010 05 2010 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $85 $31 Implemented
UM0366 # 04 Y:2010 04 2010 INSULATE BARE EQUIPMENT $2,117 $596 Implemented
UM0358 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,552 $36,000 Implemented
UM0358 # 07 Y:2009 07 2009 INSULATE BARE EQUIPMENT $5,125 $11,770 Implemented
UM0358 # 01 Y:2009 01 2009 ISOLATE HOT OR COLD EQUIPMENT $21,998 $720 Implemented
UM0358 # 05 Y:2009 05 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $69 $62 Implemented
UM0358 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,988 $23,603 Implemented