Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0240 # 01 Y:2017 | 01 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,020 | $6,000 | Implemented |
MZ0240 # 02 Y:2017 | 02 | 2017 | INSTALL OCCUPANCY SENSORS | $8,183 | $2,100 | Implemented |
MZ0240 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,206 | $250 | Implemented |
MZ0240 # 05 Y:2017 | 05 | 2017 | INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION | $7,139 | $5,400 | Implemented |
MZ0240 # 06 Y:2017 | 06 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,745 | $1,160 | Implemented |
MZ0240 # 07 Y:2017 | 07 | 2017 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $119,328 | $208,000 | Implemented |
MZ0240 # 08 Y:2017 | 08 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $13,024 | $70,500 | Implemented |
MZ0148 # 04 Y:2014 | 04 | 2014 | INSULATE BARE EQUIPMENT | $546 | $2,000 | Implemented |
MZ0148 # 07 Y:2014 | 07 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $380 | $1,000 | Implemented |
MZ0148 # 01 Y:2014 | 01 | 2014 | USE PHOTOCELL CONTROLS | $1,021 | $980 | Implemented |
MZ0085 # 03 Y:2012 | 03 | 2012 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $72,621 | $8,500 | Implemented |
MZ0085 # 02 Y:2012 | 02 | 2012 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $79,573 | $6,500 | Implemented |
MZ0085 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,801 | $8,200 | Implemented |
IA0370 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,763 | $1,492 | Implemented |
IA0370 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,500 | $20,993 | Implemented |
IA0370 # 07 Y:2005 | 07 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,192 | $0 | Implemented |
BD0266 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,081 | $2,765 | Implemented |
BD0266 # 05 Y:2004 | 05 | 2004 | INSTALL OCCUPANCY SENSORS | $703 | $1,425 | Implemented |
BD0266 # 06 Y:2004 | 06 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $504 | $220 | Implemented |
BD0266 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $382 | $323 | Implemented |
BD0266 # 08 Y:2004 | 08 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $329 | $510 | Implemented |
BD0266 # 10 Y:2004 | 10 | 2004 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $1,020 | $96 | Implemented |
BD0266 # 11 Y:2004 | 11 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $3,200 | $96 | Implemented |
BD0266 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,992 | $600 | Implemented |
BD0266 # 02 Y:2004 | 02 | 2004 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $6,225 | $4,930 | Implemented |