Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
45
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0572 # 05 Y:2024 | 05 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,754 | $4,000 | Implemented |
LE0572 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,224 | $13,206 | Implemented |
LE0572 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,562 | $4,791 | Implemented |
LE0572 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,039 | $0 | Implemented |
LE0572 # 01 Y:2024 | 01 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $812 | $0 | Implemented |
LE0445 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,741 | $6,692 | Implemented |
LE0445 # 04 Y:2017 | 04 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $525 | $750 | Implemented |
LE0445 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,590 | $1,500 | Implemented |
LE0445 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,107 | $1,000 | Implemented |
DL0047 # 03 Y:2010 | 03 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,212 | $0 | Implemented |
DL0047 # 11 Y:2010 | 11 | 2010 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $750 | $2,800 | Implemented |
DL0047 # 08 Y:2010 | 08 | 2010 | INSTALL OCCUPANCY SENSORS | $3,491 | $1,573 | Implemented |
DL0047 # 07 Y:2010 | 07 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $30,000 | $6,000 | Implemented |
DL0047 # 05 Y:2010 | 05 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,068 | $0 | Implemented |
DL0047 # 01 Y:2010 | 01 | 2010 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,774 | $0 | Implemented |
LE0177 # 04 Y:2004 | 04 | 2004 | USE OPTIMUM THICKNESS INSULATION | $516 | $585 | Implemented |
LE0177 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,194 | $0 | Implemented |
LE0110 # 04 Y:2001 | 04 | 2001 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $1,500 | $0 | Implemented |
LE0110 # 03 Y:2001 | 03 | 2001 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $1,628 | $500 | Implemented |
LE0110 # 01 Y:2001 | 01 | 2001 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $19,815 | $300 | Implemented |
WV0208 # 02 Y:2001 | 02 | 2001 | USE SYNTHETIC LUBRICANT | $303 | $254 | Implemented |
WV0208 # 05 Y:2001 | 05 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,573 | $203 | Implemented |
WV0208 # 13 Y:2001 | 13 | 2001 | EXPAND OPERATIONS INTO UNUSED SPACE | $42,527 | $36,400 | Implemented |
WV0208 # 01 Y:2001 | 01 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $13,153 | $950 | Implemented |
WV0208 # 04 Y:2001 | 04 | 2001 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $633 | $340 | Implemented |