Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,577
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0111 # 06 Y:2018 | 06 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $280 | $801 | Not Implemented |
IP0111 # 07 Y:2018 | 07 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $95 | $295 | Not Implemented |
IP0111 # 08 Y:2018 | 08 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,310 | $4,238 | Not Implemented |
IP0111 # 09 Y:2018 | 09 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $180 | $679 | Implemented |
IP0110 # 01 Y:2018 | 01 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $23,973 | $5 | Implemented |
IP0110 # 02 Y:2018 | 02 | 2018 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $742 | $0 | Not Implemented |
IP0110 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,835 | $130 | Implemented |
IP0110 # 04 Y:2018 | 04 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,072 | $30 | Not Implemented |
IP0110 # 05 Y:2018 | 05 | 2018 | INSTALL OCCUPANCY SENSORS | $21,079 | $3,360 | Implemented |
IP0110 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,905 | $5,340 | Implemented |
IP0110 # 07 Y:2018 | 07 | 2018 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $13,014 | $13,520 | Not Implemented |
IP0110 # 08 Y:2018 | 08 | 2018 | INSULATE BARE EQUIPMENT | $655 | $945 | Implemented |
IP0110 # 09 Y:2018 | 09 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $11,070 | $21,274 | Implemented |
IP0110 # 10 Y:2018 | 10 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,081 | $30,250 | Implemented |
WV0567 # 01 Y:2018 | 01 | 2018 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $11,443 | $23,150 | Not Implemented |
WV0567 # 02 Y:2018 | 02 | 2018 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $5,472 | $5,600 | Not Implemented |
WV0567 # 03 Y:2018 | 03 | 2018 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $9,322 | $15,000 | Not Implemented |
WV0567 # 04 Y:2018 | 04 | 2018 | INSTALL OCCUPANCY SENSORS | $5,896 | $6,014 | Implemented |
WV0567 # 05 Y:2018 | 05 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,472 | $2,150 | Not Implemented |
WV0567 # 06 Y:2018 | 06 | 2018 | RECYCLE WHITE WATER | $4,061 | $450 | Implemented |
WV0567 # 07 Y:2018 | 07 | 2018 | INSULATE BARE EQUIPMENT | $1,487 | $1,690 | Implemented |
WV0567 # 08 Y:2018 | 08 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $495 | $500 | Implemented |
WV0567 # 09 Y:2018 | 09 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $408 | $563 | Implemented |
SD0573 # 01 Y:2018 | 01 | 2018 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $14,519 | $67,626 | Implemented |
SD0573 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,784 | $5,838 | Implemented |