Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
179
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NT0017 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $734 | $2,396 | Not Implemented |
NT0017 # 02 Y:2023 | 02 | 2023 | OPTIMIZE PLANT POWER FACTOR | $7,255 | $2,016 | Not Implemented |
NT0017 # 03 Y:2023 | 03 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $262 | $0 | Implemented |
NT0017 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,009 | $0 | Implemented |
NT0017 # 01 Y:2023 | 01 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $50,287 | $1,258 | Not Implemented |
NT0017 # 05 Y:2023 | 05 | 2023 | INSULATE BARE EQUIPMENT | $1,567 | $1,311 | Not Implemented |
NT0009 # 06 Y:2023 | 06 | 2023 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $78,488 | $41,034 | Not Implemented |
NT0009 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,822 | $32,367 | Not Implemented |
NT0009 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,911 | $5,609 | Implemented |
NT0009 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $13,598 | $10,844 | Not Implemented |
NT0009 # 02 Y:2023 | 02 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,305 | $1,258 | Not Implemented |
NT0009 # 05 Y:2023 | 05 | 2023 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,796 | $18,600 | Not Implemented |
TR0028 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,361 | $5,404 | Not Implemented |
TR0028 # 05 Y:2022 | 05 | 2022 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $787 | $1,511 | Implemented |
TR0028 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,972 | $3,155 | Implemented |
TR0028 # 03 Y:2022 | 03 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,119 | $11,200 | Not Implemented |
TR0028 # 04 Y:2022 | 04 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,584 | $602 | Implemented |
AM0771 # 07 Y:2019 | 07 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $240 | $350 | Not Implemented |
AM0771 # 06 Y:2019 | 06 | 2019 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $300 | $26 | Implemented |
AM0771 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $950 | $0 | Not Implemented |
AM0771 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,500 | $1,340 | Implemented |
AM0771 # 03 Y:2019 | 03 | 2019 | OPTIMIZE PLANT POWER FACTOR | $6,400 | $12,960 | Implemented |
AM0771 # 02 Y:2019 | 02 | 2019 | REPLACE BOILER | $8,200 | $42,760 | Implemented |
AM0771 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,590 | $8,175 | Implemented |
AM0758 # 06 Y:2018 | 06 | 2018 | INSTALL OCCUPANCY SENSORS | $485 | $320 | Implemented |