Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
57
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0857 # 01 Y:2012 | 01 | 2012 | REDUCE WATER USE WITH COUNTER CURRENT RINSING | $4,781 | $2,000 | Not Implemented |
UD0857 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,979 | $11,880 | Not Implemented |
UD0857 # 03 Y:2012 | 03 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,696 | $6,800 | Not Implemented |
UD0857 # 09 Y:2012 | 09 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,816 | $2,680 | Not Implemented |
UD0857 # 08 Y:2012 | 08 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $12,178 | $36,000 | Not Implemented |
UD0857 # 07 Y:2012 | 07 | 2012 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $7,051 | $2,000 | Not Implemented |
UD0857 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $807 | $1,000 | Not Implemented |
UD0857 # 05 Y:2012 | 05 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $834 | $2,000 | Not Implemented |
MZ0085 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,801 | $8,200 | Implemented |
MZ0085 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,648 | $820 | Not Implemented |
MZ0085 # 02 Y:2012 | 02 | 2012 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $79,573 | $6,500 | Implemented |
MZ0085 # 03 Y:2012 | 03 | 2012 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $72,621 | $8,500 | Implemented |
TT0088 # 03 Y:2012 | 03 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $4,506 | $5,300 | Not Implemented |
TT0088 # 01 Y:2012 | 01 | 2012 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $192 | $25 | Not Implemented |
TT0088 # 10 Y:2012 | 10 | 2012 | USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS | $19,167 | $47,935 | Not Implemented |
TT0088 # 09 Y:2012 | 09 | 2012 | METER WASTE WATER | $3,603 | $750 | Not Implemented |
TT0088 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $77 | $1,014 | Not Implemented |
TT0088 # 07 Y:2012 | 07 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,346 | $3,350 | Not Implemented |
TT0088 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $626 | $11,880 | Not Implemented |
TT0088 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,989 | $10,200 | Not Implemented |
TT0088 # 04 Y:2012 | 04 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $800 | $850 | Not Implemented |
TT0088 # 02 Y:2012 | 02 | 2012 | OPTIMIZE PLANT POWER FACTOR | $1,465 | $3,978 | Not Implemented |
MA0691 # 05 Y:2012 | 05 | 2012 | INSULATE BARE EQUIPMENT | $772 | $1,575 | Implemented |
MA0691 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,115 | $19,125 | Not Implemented |
MA0691 # 02 Y:2012 | 02 | 2012 | USE MINIMUM SAFE OVEN VENTILATION | $9,618 | $18,525 | Not Implemented |