IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0205 # 08 Y:1997 08 1997 INSTALL OCCUPANCY SENSORS $1,348 $1,425 Not Implemented
AS0205 # 09 Y:1997 09 1997 TREAT AND REUSE RINSE WATERS $4,004 $950 Not Implemented
AS0205 # 10 Y:1997 10 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $15,110 $4,500 Not Implemented
AS0205 # 11 Y:1997 11 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,076 $30 Implemented
AS0206 # 01 Y:1997 01 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,800 $7,000 Not Implemented
AS0206 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,330 $220 Implemented
AS0206 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,393 $2,503 Not Implemented
AS0206 # 04 Y:1997 04 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,124 $225 Not Implemented
AS0143 # 06 Y:1995 06 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $349 $599 Implemented
AS0143 # 01 Y:1995 01 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,285 $17,600 Implemented
AS0143 # 02 Y:1995 02 1995 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $13,244 $60,000 Implemented
AS0143 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,764 $5,461 Implemented
AS0143 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,544 $0 Implemented
AS0143 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,823 $500 Implemented
AS0143 # 07 Y:1995 07 1995 INSULATE BARE EQUIPMENT $8,829 $10,900 Implemented
AS0143 # 08 Y:1995 08 1995 INCREASE AMOUNT OF CONDENSATE RETURNED $4,832 $10,100 Not Implemented
AS0143 # 09 Y:1995 09 1995 ADJUST BURNERS FOR EFFICIENT OPERATION $1,479 $2,000 Implemented
AS0143 # 10 Y:1995 10 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $163 $115 Implemented
AS0078 # 02 Y:1993 02 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $54,544 $70,044 Implemented
AS0078 # 01 Y:1993 01 1993 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $167,933 $370,044 Not Implemented
AS0078 # 03 Y:1993 03 1993 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $403 $1,200 Implemented
AS0078 # 04 Y:1993 04 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,061 $10,100 Not Implemented
AS0078 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,119 $0 Implemented
AS0078 # 06 Y:1993 06 1993 USE SYNTHETIC LUBRICANT $364 $0 Implemented
AS0078 # 07 Y:1993 07 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $219 $450 Not Implemented