Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
126
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0017 # 06 Y:2013 | 06 | 2013 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $600 | $159 | Implemented |
IP0017 # 07 Y:2013 | 07 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $13,599 | $15,000 | Not Implemented |
IP0017 # 08 Y:2013 | 08 | 2013 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,689 | $3,600 | Not Implemented |
IP0017 # 09 Y:2013 | 09 | 2013 | COVER OPEN TANKS | $373 | $503 | Implemented |
IP0017 # 10 Y:2013 | 10 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,437 | $9,348 | Implemented |
IC0106 # 01 Y:2005 | 01 | 2005 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $19,946 | $16,320 | Implemented |
IC0106 # 02 Y:2005 | 02 | 2005 | REPAIR AND ELIMINATE STEAM LEAKS | $32,401 | $6,800 | Implemented |
IC0106 # 03 Y:2005 | 03 | 2005 | REPAIR OR REPLACE STEAM TRAPS | $10,215 | $314 | Implemented |
IC0106 # 04 Y:2005 | 04 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,280 | $46,950 | Implemented |
IC0106 # 05 Y:2005 | 05 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,132 | $54,716 | Not Implemented |
IC0106 # 06 Y:2005 | 06 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $513 | $107 | Implemented |
IC0106 # 07 Y:2005 | 07 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,315 | $0 | Implemented |
IC0106 # 08 Y:2005 | 08 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $38,651 | $1,902 | Implemented |
IC0106 # 09 Y:2005 | 09 | 2005 | OPTIMIZE PLANT POWER FACTOR | $69,451 | $120,000 | Implemented |
IC0106 # 10 Y:2005 | 10 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $23,550 | $2,522 | Not Implemented |
IC0106 # 11 Y:2005 | 11 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $16,926 | $20,423 | Implemented |
IC0106 # 12 Y:2005 | 12 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,545 | $890 | Implemented |
IC0106 # 13 Y:2005 | 13 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,662 | $900 | Implemented |
IC0106 # 14 Y:2005 | 14 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,959 | $73,466 | Implemented |
UD0671 # 01 Y:2003 | 01 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $137,400 | $100,000 | Not Implemented |
UD0671 # 02 Y:2003 | 02 | 2003 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $17,075 | $70 | Implemented |
UD0671 # 03 Y:2003 | 03 | 2003 | ADD AREA LIGHTING SWITCHES | $12,090 | $15,000 | Not Implemented |
UD0671 # 04 Y:2003 | 04 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,713 | $0 | Not Implemented |
UD0671 # 05 Y:2003 | 05 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,275 | $0 | Implemented |
UD0671 # 06 Y:2003 | 06 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,103 | $442 | Not Implemented |