IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

178

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0148 # 01 Y:1999 01 1999 RECOVER WASTE HEAT FROM EQUIPMENT $10,397 $3,000 n/a
BD0148 # 02 Y:1999 02 1999 USE POWER DURING OFF-PEAK PERIODS $9,788 $1,000 n/a
BD0148 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,112 $0 n/a
BD0148 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,057 $800 n/a
BD0148 # 05 Y:1999 05 1999 INSTALL OCCUPANCY SENSORS $945 $1,350 n/a
BD0148 # 06 Y:1999 06 1999 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $653 $644 n/a
BD0148 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $428 $1,350 n/a
BD0148 # 08 Y:1999 08 1999 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $22,175 $25,000 n/a
BD0148 # 09 Y:1999 09 1999 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $15,837 $22,000 n/a
BD0148 # 10 Y:1999 10 1999 PAY BILLS ON TIME TO AVOID LATE FEES $49,668 $0 n/a
BD0107 # 01 Y:1998 01 1998 UPGRADE CONTROLS ON COMPRESSORS $19,185 $31,500 Implemented
BD0107 # 02 Y:1998 02 1998 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,679 $6,000 Not Implemented
BD0107 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,897 $1,000 Not Implemented
BD0107 # 04 Y:1998 04 1998 INSTALL AUTOMATIC STACK DAMPER $1,388 $2,500 Not Implemented
BD0107 # 05 Y:1998 05 1998 INSTALL OCCUPANCY SENSORS $750 $300 Implemented
BD0107 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $278 $470 Implemented
BD0107 # 07 Y:1998 07 1998 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $21,088 $7,500 Not Implemented
BD0107 # 08 Y:1998 08 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,899 $7,000 Implemented
BD0107 # 09 Y:1998 09 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $443 $60 Not Implemented
BD0107 # 10 Y:1998 10 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $10,350 $750 Not Implemented
BD0042 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $100 $200 Implemented
BD0042 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $408 $40 Not Implemented
BD0042 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $404 $600 Implemented
BD0042 # 04 Y:1995 04 1995 SHUT OFF PILOTS IN STANDBY EQUIPMENT $131 $40 Not Implemented
BD0042 # 05 Y:1995 05 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,150 $1,030 Not Implemented