IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,577

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0243 # 01 Y:2000 01 2000 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $17,132 $28,575 Not Implemented
SD0243 # 02 Y:2000 02 2000 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,431 $7,000 Not Implemented
SD0243 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,270 $3,300 Not Implemented
SD0243 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,673 $11,336 Not Implemented
SD0243 # 05 Y:2000 05 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,209 $7,872 Implemented
SD0243 # 06 Y:2000 06 2000 INSULATE BARE EQUIPMENT $4,293 $9,936 Implemented
SD0243 # 07 Y:2000 07 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,087 $0 Not Implemented
SD0243 # 08 Y:2000 08 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,753 $1,300 Not Implemented
SD0243 # 09 Y:2000 09 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,098 $500 Implemented
SD0243 # 10 Y:2000 10 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $953 $2,425 Not Implemented
SD0243 # 11 Y:2000 11 2000 USE SOLAR HEAT FOR HEAT $536 $1,200 Not Implemented
SD0243 # 12 Y:2000 12 2000 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE $9,975 $50,000 Not Implemented
SD0243 # 13 Y:2000 13 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $17,848 $35,000 Not Implemented
SD0243 # 14 Y:2000 14 2000 INSTALL BACK-UP EQUIPMENT $2,010 $1,000 Not Implemented
MA0459 # 01 Y:2000 01 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,945 $7,695 Not Implemented
MA0459 # 02 Y:2000 02 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,064 $150 Implemented
MA0459 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $789 $150 Implemented
MA0459 # 04 Y:2000 04 2000 OPTIMIZE PLANT POWER FACTOR $557 $1,275 Not Implemented
MA0459 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $266 $1,250 Not Implemented
MA0459 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $55 $248 Implemented
CO0459 # 01 Y:2000 01 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $7,950 $660 Not Implemented
CO0459 # 02 Y:2000 02 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,550 $7,500 Not Implemented
CO0459 # 03 Y:2000 03 2000 OPTIMIZE PLANT POWER FACTOR $6,420 $15,880 Implemented
CO0459 # 04 Y:2000 04 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,670 $1,130 Not Implemented
CO0459 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,650 $2,070 Implemented