IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,577

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0212 # 06 Y:1999 06 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $1,548 $2,882 Implemented
HO0212 # 07 Y:1999 07 1999 CHANGE OPERATING CONDITIONS $8,954 $20,000 Not Implemented
HO0212 # 08 Y:1999 08 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $11,437 $2,882 Implemented
HO0212 # 09 Y:1999 09 1999 MOVE PRODUCT USING MECHANICAL MEANS $4,590 $12,000 Not Implemented
HO0212 # 10 Y:1999 10 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $6,379 $500 Implemented
SD0230 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,090 $4,048 Implemented
SD0230 # 02 Y:1999 02 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $2,483 $6,030 Not Implemented
SD0230 # 03 Y:1999 03 1999 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $257,414 $480,000 Not Implemented
SD0230 # 04 Y:1999 04 1999 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $1,099,432 $1,975,633 Not Implemented
SD0230 # 05 Y:1999 05 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $83,680 $0 Implemented
SD0230 # 06 Y:1999 06 1999 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $39,860 $16,000 Not Implemented
SD0230 # 07 Y:1999 07 1999 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $27,200 $0 Implemented
SD0230 # 08 Y:1999 08 1999 PURCHASE EQUIPMENT INSTEAD OF LEASING $0 $2,410 Implemented
MA0441 # 01 Y:1999 01 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $21,168 $5,704 Implemented
MA0441 # 02 Y:1999 02 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $43,200 $3,000 Implemented
MA0441 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $15,964 $40,000 Not Implemented
MA0441 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,069 $26,625 Not Implemented
MA0441 # 05 Y:1999 05 1999 UPGRADE OBSOLETE EQUIPMENT $789 $0 Implemented
MA0441 # 06 Y:1999 06 1999 INSULATE BARE EQUIPMENT $632 $2,250 Implemented
HO0200 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,818 $7,776 Implemented
HO0200 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,223 $3,065 Implemented
HO0200 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $944 $1,500 Not Implemented
HO0200 # 04 Y:1999 04 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $451 $100 Not Implemented
HO0200 # 05 Y:1999 05 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,395 $4,800 Implemented
HO0200 # 06 Y:1999 06 1999 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $14,628 $8,000 Not Implemented