IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,577

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0245 # 01 Y:1998 01 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,696 $0 Implemented
ME0245 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,163 $5,970 Implemented
ME0245 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,398 $400 Implemented
ME0245 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,127 $3,000 Implemented
ME0245 # 05 Y:1998 05 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,051 $2,000 Implemented
ME0245 # 06 Y:1998 06 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $895 $700 Implemented
ME0245 # 07 Y:1998 07 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $803 $900 Implemented
ME0245 # 08 Y:1998 08 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $769 $2,250 Not Implemented
ME0245 # 09 Y:1998 09 1998 INSULATE BARE EQUIPMENT $583 $129 Not Implemented
ME0245 # 10 Y:1998 10 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $443 $174 Implemented
ME0245 # 11 Y:1998 11 1998 INSULATE BARE EQUIPMENT $273 $147 Not Implemented
SD0201 # 01 Y:1998 01 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,033 $1,033 Implemented
SD0201 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,892 $6,734 Implemented
SD0201 # 03 Y:1998 03 1998 INSTALL TIMERS AND/OR THERMOSTATS $1,393 $300 Implemented
SD0201 # 04 Y:1998 04 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $13,056 $0 Implemented
SD0201 # 05 Y:1998 05 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $22,080 $0 Implemented
SD0201 # 06 Y:1998 06 1998 MOVE PRODUCT USING MECHANICAL MEANS $1,575 $2,000 Not Implemented
SD0201 # 07 Y:1998 07 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $4,725 $0 Not Implemented
HO0181 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,163 $10,944 Not Implemented
HO0181 # 02 Y:1998 02 1998 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $88,443 $310,000 Not Implemented
HO0181 # 03 Y:1998 03 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $532 $325 Implemented
HO0181 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $1,232 $1,008 Implemented
HO0181 # 05 Y:1998 05 1998 INSULATE FEEDWATER TANK $227 $72 Implemented
HO0181 # 06 Y:1998 06 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $12,922 $250 Implemented
UL0194 # 01 Y:1998 01 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,744 $16,350 Not Implemented