IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,577

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0227 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,694 $934 Implemented
BD0042 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $100 $200 Implemented
BD0042 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $408 $40 Not Implemented
BD0042 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $404 $600 Implemented
BD0042 # 04 Y:1995 04 1995 SHUT OFF PILOTS IN STANDBY EQUIPMENT $131 $40 Not Implemented
BD0042 # 05 Y:1995 05 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,150 $1,030 Not Implemented
BD0042 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,662 $4,470 Not Implemented
BD0042 # 07 Y:1995 07 1995 INSTALL OCCUPANCY SENSORS $981 $675 Implemented
BD0042 # 08 Y:1995 08 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $438 $472 Implemented
BD0042 # 09 Y:1995 09 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $147 $235 Not Implemented
BD0042 # 10 Y:1995 10 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,879 $2,250 Implemented
WI0244 # 01 Y:1995 01 1995 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $29,259 $120,000 n/a
WI0244 # 02 Y:1995 02 1995 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $12,574 $6,250 n/a
WI0244 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,927 $270 n/a
WI0244 # 04 Y:1995 04 1995 RECOVER WASTE HEAT FROM EQUIPMENT $2,299 $1,000 n/a
WI0244 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $750 $640 n/a
WI0244 # 06 Y:1995 06 1995 COVER OPEN TANKS $4,164 $2,400 n/a
WI0244 # 07 Y:1995 07 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,594 $500 n/a
WI0244 # 08 Y:1995 08 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $504 $0 n/a
WI0244 # 09 Y:1995 09 1995 INSTALL OCCUPANCY SENSORS $483 $225 n/a
WI0244 # 10 Y:1995 10 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $310 $631 n/a
ND0219 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,069 $600 Implemented
ND0219 # 02 Y:1995 02 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,373 $200 Implemented
ND0219 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,443 $2,720 Implemented
ND0219 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,277 $1,180 Implemented