Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2208 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,664 | $2,080 | Implemented |
UW2208 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $954 | $2,680 | Implemented |
UW2208 # 01 Y:2022 | 01 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $643 | $0 | Implemented |
UW2208 # 03 Y:2022 | 03 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,686 | $122 | Implemented |
UW2206 # 02 Y:2022 | 02 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $567 | $122 | Implemented |
UW2206 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,718 | $0 | Implemented |
UW2206 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $999 | $2,199 | Implemented |
UW2206 # 05 Y:2022 | 05 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $782 | $0 | Implemented |
UW2206 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,058 | $2,080 | Implemented |
UW0033 # 06 Y:2010 | 06 | 2010 | INSTALL OCCUPANCY SENSORS | $292 | $0 | Not Implemented |
UW0033 # 05 Y:2010 | 05 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $429 | $0 | Implemented |
UW0033 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $620 | $0 | Not Implemented |
UW0033 # 03 Y:2010 | 03 | 2010 | INSULATE BARE EQUIPMENT | $5,340 | $0 | Not Implemented |
UW0033 # 02 Y:2010 | 02 | 2010 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $7,344 | $0 | Not Implemented |
UW0033 # 01 Y:2010 | 01 | 2010 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,132 | $0 | Not Implemented |
OR0229 # 04 Y:1995 | 04 | 1995 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $37,639 | $13,819 | Not Implemented |
OR0229 # 05 Y:1995 | 05 | 1995 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $42,278 | $66,500 | Implemented |
OR0229 # 03 Y:1995 | 03 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $85 | $269 | Implemented |
OR0229 # 02 Y:1995 | 02 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,010 | $2,000 | Implemented |
OR0229 # 01 Y:1995 | 01 | 1995 | INSULATE BARE EQUIPMENT | $1,955 | $445 | Not Implemented |
OR0228 # 05 Y:1995 | 05 | 1995 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $13,587 | $54,901 | Implemented |
OR0228 # 04 Y:1995 | 04 | 1995 | RECOVER AND REUSE WASTE MATERIAL | $2,920 | $240 | Not Implemented |
OR0228 # 03 Y:1995 | 03 | 1995 | INSULATE BARE EQUIPMENT | $8,136 | $32,460 | Not Implemented |
OR0228 # 02 Y:1995 | 02 | 1995 | REPLACE BOILER | $3,686 | $17,870 | Not Implemented |
OR0228 # 01 Y:1995 | 01 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $196 | $376 | Implemented |