IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2208 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,664 $2,080 Implemented
UW2208 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $954 $2,680 Implemented
UW2208 # 01 Y:2022 01 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $643 $0 Implemented
UW2208 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,686 $122 Implemented
UW2206 # 02 Y:2022 02 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $567 $122 Implemented
UW2206 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,718 $0 Implemented
UW2206 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $999 $2,199 Implemented
UW2206 # 05 Y:2022 05 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $782 $0 Implemented
UW2206 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,058 $2,080 Implemented
UW0033 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $292 $0 Not Implemented
UW0033 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $429 $0 Implemented
UW0033 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $620 $0 Not Implemented
UW0033 # 03 Y:2010 03 2010 INSULATE BARE EQUIPMENT $5,340 $0 Not Implemented
UW0033 # 02 Y:2010 02 2010 DISTILL CONTAMINATED SOLVENTS FOR REUSE $7,344 $0 Not Implemented
UW0033 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $9,132 $0 Not Implemented
OR0229 # 04 Y:1995 04 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $37,639 $13,819 Not Implemented
OR0229 # 05 Y:1995 05 1995 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $42,278 $66,500 Implemented
OR0229 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $85 $269 Implemented
OR0229 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,010 $2,000 Implemented
OR0229 # 01 Y:1995 01 1995 INSULATE BARE EQUIPMENT $1,955 $445 Not Implemented
OR0228 # 05 Y:1995 05 1995 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $13,587 $54,901 Implemented
OR0228 # 04 Y:1995 04 1995 RECOVER AND REUSE WASTE MATERIAL $2,920 $240 Not Implemented
OR0228 # 03 Y:1995 03 1995 INSULATE BARE EQUIPMENT $8,136 $32,460 Not Implemented
OR0228 # 02 Y:1995 02 1995 REPLACE BOILER $3,686 $17,870 Not Implemented
OR0228 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $196 $376 Implemented