IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0215 # 07 Y:1997 07 1997 IMPROVE HANDLING PRACTICES $370 $0 Implemented
AS0215 # 06 Y:1997 06 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $534 $30 Implemented
AS0215 # 05 Y:1997 05 1997 INSTALL TIMERS AND/OR THERMOSTATS $564 $480 Implemented
AS0215 # 04 Y:1997 04 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,409 $1,500 Not Implemented
AS0215 # 03 Y:1997 03 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $371 $315 Not Implemented
AS0215 # 02 Y:1997 02 1997 INSTALL OCCUPANCY SENSORS $185 $450 Implemented
AS0215 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,408 $2,681 Implemented
AS0215 # 08 Y:1997 08 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $192 $15 Not Implemented
AS0215 # 09 Y:1997 09 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $16,847 $43,100 Not Implemented
MA0400 # 04 Y:1997 04 1997 INSULATE BARE EQUIPMENT $605 $970 Not Implemented
MA0400 # 02 Y:1997 02 1997 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $17,497 $92,676 Not Implemented
MA0400 # 01 Y:1997 01 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $347,702 $505,000 Not Implemented
MA0400 # 03 Y:1997 03 1997 COVER OPEN TANKS $15,677 $6,578 Implemented
MA0400 # 05 Y:1997 05 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $388 $0 Implemented
AS0206 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,393 $2,503 Not Implemented
AS0206 # 04 Y:1997 04 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,124 $225 Not Implemented
AS0206 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,330 $220 Implemented
AS0206 # 01 Y:1997 01 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,800 $7,000 Not Implemented
AS0205 # 11 Y:1997 11 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,076 $30 Implemented
AS0205 # 09 Y:1997 09 1997 TREAT AND REUSE RINSE WATERS $4,004 $950 Not Implemented
AS0205 # 08 Y:1997 08 1997 INSTALL OCCUPANCY SENSORS $1,348 $1,425 Not Implemented
AS0205 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $714 $40 Implemented
AS0205 # 05 Y:1997 05 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,943 $7,500 Not Implemented
AS0205 # 03 Y:1997 03 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $815 $70 Implemented
AS0205 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,290 $7,006 Not Implemented