IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

809

matching recommendations
Reset
SIC 3471 Plating And Polishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0312 # 09 Y:2001 09 2001 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $16,147 $1,786 Implemented
IC0009 # 01 Y:2001 01 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $703 $1,500 Implemented
IC0009 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,338 $1,000 Implemented
IC0009 # 04 Y:2001 04 2001 INSULATE BARE EQUIPMENT $423 $1,863 Implemented
IC0009 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $749 $201 Implemented
IC0009 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $1,096 $3,753 Implemented
IC0009 # 09 Y:2001 09 2001 AUTOMATE PAYROLL SYSTEM $37,300 $9,195 Implemented
UD0613 # 02 Y:2001 02 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $15,606 $14,000 Implemented
UD0613 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,566 $0 Implemented
UD0613 # 04 Y:2001 04 2001 USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) $5,513 $5,000 Implemented
UD0613 # 05 Y:2001 05 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,342 $0 Implemented
CO0478 # 01 Y:2000 01 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,280 $4,000 Implemented
CO0478 # 02 Y:2000 02 2000 INSULATE BARE EQUIPMENT $1,970 $2,360 Implemented
CO0478 # 03 Y:2000 03 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,550 $5,200 Implemented
CO0478 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $510 $290 Implemented
CO0478 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $400 $1,370 Implemented
CO0478 # 06 Y:2000 06 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $280 $60 Implemented
CO0478 # 07 Y:2000 07 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $240 $300 Implemented
CO0478 # 08 Y:2000 08 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $130 $0 Implemented
CO0478 # 09 Y:2000 09 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $6,350 $12,000 Implemented
SD0243 # 05 Y:2000 05 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,209 $7,872 Implemented
SD0243 # 06 Y:2000 06 2000 INSULATE BARE EQUIPMENT $4,293 $9,936 Implemented
SD0243 # 09 Y:2000 09 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,098 $500 Implemented
DS0156 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $253 $600 Implemented
DS0156 # 04 Y:2000 04 2000 METER WASTE WATER $9,582 $1,200 Implemented