Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
48
matching recommendationsSIC | 3471 | Plating And Polishing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0675 # 04 Y:2013 | 04 | 2013 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $270 | $290 | Implemented |
CO0500 # 06 Y:2002 | 06 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $290 | $50 | Implemented |
CO0500 # 05 Y:2002 | 05 | 2002 | INSULATE BARE EQUIPMENT | $730 | $300 | Implemented |
CO0500 # 02 Y:2002 | 02 | 2002 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $8,990 | $300 | Implemented |
CO0500 # 01 Y:2002 | 01 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $29,000 | $7,000 | Implemented |
CO0478 # 03 Y:2000 | 03 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,550 | $5,200 | Implemented |
CO0478 # 01 Y:2000 | 01 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,280 | $4,000 | Implemented |
CO0478 # 02 Y:2000 | 02 | 2000 | INSULATE BARE EQUIPMENT | $1,970 | $2,360 | Implemented |
CO0478 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $510 | $290 | Implemented |
CO0478 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $400 | $1,370 | Implemented |
CO0478 # 06 Y:2000 | 06 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $280 | $60 | Implemented |
CO0478 # 07 Y:2000 | 07 | 2000 | INSTALL / REPAIR INSULATION ON STEAM LINES | $240 | $300 | Implemented |
CO0478 # 08 Y:2000 | 08 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $130 | $0 | Implemented |
CO0478 # 09 Y:2000 | 09 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $6,350 | $12,000 | Implemented |
CO0429 # 04 Y:1998 | 04 | 1998 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $6,000 | $10,160 | Implemented |
CO0429 # 02 Y:1998 | 02 | 1998 | CLOSELY MONITOR CHEMICAL ADDITIONS TO INCREASE BATH LIFE | $4,860 | $0 | Implemented |
CO0429 # 01 Y:1998 | 01 | 1998 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $840 | $1,000 | Implemented |
CO0217 # 06 Y:1991 | 06 | 1991 | INSTALL SET-BACK TIMERS | $340 | $1,040 | Implemented |
CO0217 # 05 Y:1991 | 05 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $218 | $325 | Implemented |
CO0217 # 04 Y:1991 | 04 | 1991 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $1,160 | $1,150 | Implemented |
CO0217 # 03 Y:1991 | 03 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,180 | $1,000 | Implemented |
CO0217 # 02 Y:1991 | 02 | 1991 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $1,560 | $2,500 | Implemented |
CO0217 # 01 Y:1991 | 01 | 1991 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $9,147 | $1,550 | Implemented |
CO0168 # 09 Y:1989 | 09 | 1989 | INSTALL AUTOMATIC STACK DAMPER | $410 | $1,000 | Implemented |
CO0168 # 07 Y:1989 | 07 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $550 | $300 | Implemented |