Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
Reset
SIC 3471 Plating And Polishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0675 # 04 Y:2013 04 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $270 $290 Implemented
CO0500 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $290 $50 Implemented
CO0500 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $730 $300 Implemented
CO0500 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $29,000 $7,000 Implemented
CO0500 # 02 Y:2002 02 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,990 $300 Implemented
CO0478 # 03 Y:2000 03 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,550 $5,200 Implemented
CO0478 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $400 $1,370 Implemented
CO0478 # 01 Y:2000 01 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,280 $4,000 Implemented
CO0478 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $510 $290 Implemented
CO0478 # 06 Y:2000 06 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $280 $60 Implemented
CO0478 # 07 Y:2000 07 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $240 $300 Implemented
CO0478 # 08 Y:2000 08 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $130 $0 Implemented
CO0478 # 09 Y:2000 09 2000 $6,350 $12,000 Implemented
CO0478 # 02 Y:2000 02 2000 INSULATE BARE EQUIPMENT $1,970 $2,360 Implemented
CO0429 # 01 Y:1998 01 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $840 $1,000 Implemented
CO0429 # 04 Y:1998 04 1998 $6,000 $10,160 Implemented
CO0429 # 02 Y:1998 02 1998 CLOSELY MONITOR CHEMICAL ADDITIONS TO INCREASE BATH LIFE $4,860 $0 Implemented
CO0217 # 02 Y:1991 02 1991 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,560 $2,500 Implemented
CO0217 # 06 Y:1991 06 1991 INSTALL SET-BACK TIMERS $340 $1,040 Implemented
CO0217 # 03 Y:1991 03 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,180 $1,000 Implemented
CO0217 # 05 Y:1991 05 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $218 $325 Implemented
CO0217 # 04 Y:1991 04 1991 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,160 $1,150 Implemented
CO0217 # 01 Y:1991 01 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,147 $1,550 Implemented
CO0168 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $955 $425 Implemented
CO0168 # 07 Y:1989 07 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $550 $300 Implemented