Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsSIC | 3471 | Plating And Polishing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1089 # 01 Y:2023 | 01 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,064 | $22,000 | Implemented |
OK1089 # 03 Y:2023 | 03 | 2023 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $4,600 | $2,921 | Implemented |
OK1089 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,107 | $2,128 | Implemented |
OK1089 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,067 | $0 | Implemented |
OK1089 # 02 Y:2023 | 02 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,905 | $14,300 | Implemented |
OK1089 # 06 Y:2023 | 06 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,039 | $2,100 | Implemented |
OK0772 # 07 Y:2009 | 07 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,532 | $2,954 | Implemented |
OK0772 # 05 Y:2009 | 05 | 2009 | OPERATE BOILERS ON HIGH FIRE SETTING | $4,261 | $17,500 | Implemented |
OK0772 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,160 | $0 | Implemented |
OK0772 # 01 Y:2009 | 01 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,160 | $0 | Implemented |
OK0723 # 08 Y:2006 | 08 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,096 | $42,002 | Implemented |
OK0723 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,876 | $17,879 | Implemented |
OK0723 # 05 Y:2006 | 05 | 2006 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $3,531 | $5,250 | Implemented |
OK0723 # 03 Y:2006 | 03 | 2006 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,135 | $587 | Implemented |
OK0723 # 01 Y:2006 | 01 | 2006 | OPERATE BOILERS ON HIGH FIRE SETTING | $23,600 | $18,000 | Implemented |
OK0369 # 01 Y:1992 | 01 | 1992 | OPTIMIZE PLANT POWER FACTOR | $1,250 | $990 | Implemented |
OK0369 # 04 Y:1992 | 04 | 1992 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $946 | $0 | Implemented |
OK0369 # 03 Y:1992 | 03 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,038 | $0 | Implemented |
OK0178 # 10 Y:1985 | 10 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $579 | $250 | Implemented |
OK0178 # 08 Y:1985 | 08 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $64 | $55 | Implemented |
OK0178 # 07 Y:1985 | 07 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $244 | $200 | Implemented |
OK0178 # 04 Y:1985 | 04 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $178 | $150 | Implemented |
OK0178 # 03 Y:1985 | 03 | 1985 | USE RADIANT HEATER FOR SPOT HEATING | $1,400 | $2,120 | Implemented |
OK0178 # 02 Y:1985 | 02 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,524 | $4,000 | Implemented |
OK0143 # 03 Y:1984 | 03 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $604 | $0 | Implemented |