Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,529
matching recommendationsSIC | 3471 | Plating And Polishing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0586 # 01 Y:2005 | 01 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,190 | $0 | Not Implemented |
MA0586 # 02 Y:2005 | 02 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,081 | $140 | Implemented |
MA0586 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $3,200 | $0 | Implemented |
MA0586 # 04 Y:2005 | 04 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,415 | $350 | Not Implemented |
MA0586 # 05 Y:2005 | 05 | 2005 | COMBINE UTILITY METERS | $1,736 | $1,950 | Implemented |
MA0586 # 06 Y:2005 | 06 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $841 | $1,646 | Implemented |
MA0586 # 07 Y:2005 | 07 | 2005 | INSTALL OCCUPANCY SENSORS | $443 | $1,395 | Implemented |
IC0106 # 01 Y:2005 | 01 | 2005 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $19,946 | $16,320 | Implemented |
IC0106 # 02 Y:2005 | 02 | 2005 | REPAIR AND ELIMINATE STEAM LEAKS | $32,401 | $6,800 | Implemented |
IC0106 # 03 Y:2005 | 03 | 2005 | REPAIR OR REPLACE STEAM TRAPS | $10,215 | $314 | Implemented |
IC0106 # 04 Y:2005 | 04 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,280 | $46,950 | Implemented |
IC0106 # 05 Y:2005 | 05 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,132 | $54,716 | Not Implemented |
IC0106 # 06 Y:2005 | 06 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $513 | $107 | Implemented |
IC0106 # 07 Y:2005 | 07 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,315 | $0 | Implemented |
IC0106 # 08 Y:2005 | 08 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $38,651 | $1,902 | Implemented |
IC0106 # 09 Y:2005 | 09 | 2005 | OPTIMIZE PLANT POWER FACTOR | $69,451 | $120,000 | Implemented |
IC0106 # 10 Y:2005 | 10 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $23,550 | $2,522 | Not Implemented |
IC0106 # 11 Y:2005 | 11 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $16,926 | $20,423 | Implemented |
IC0106 # 12 Y:2005 | 12 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,545 | $890 | Implemented |
IC0106 # 13 Y:2005 | 13 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,662 | $900 | Implemented |
IC0106 # 14 Y:2005 | 14 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,959 | $73,466 | Implemented |
WV0315 # 01 Y:2005 | 01 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $9,051 | $901 | Implemented |
WV0315 # 02 Y:2005 | 02 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,726 | $1,000 | Implemented |
WV0315 # 03 Y:2005 | 03 | 2005 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,606 | $3,300 | Not Implemented |
WV0315 # 04 Y:2005 | 04 | 2005 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $2,658 | $0 | Implemented |