Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,529
matching recommendationsSIC | 3471 | Plating And Polishing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0009 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,325 | $115 | Not Implemented |
IC0009 # 04 Y:2001 | 04 | 2001 | INSULATE BARE EQUIPMENT | $423 | $1,863 | Implemented |
IC0009 # 05 Y:2001 | 05 | 2001 | INSULATE BARE EQUIPMENT | $749 | $201 | Implemented |
IC0009 # 06 Y:2001 | 06 | 2001 | INSULATE BARE EQUIPMENT | $1,096 | $3,753 | Implemented |
IC0009 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,742 | $6,722 | Not Implemented |
IC0009 # 08 Y:2001 | 08 | 2001 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $28,900 | $206,000 | Not Implemented |
IC0009 # 09 Y:2001 | 09 | 2001 | AUTOMATE PAYROLL SYSTEM | $37,300 | $9,195 | Implemented |
IC0009 # 10 Y:2001 | 10 | 2001 | MODIFY WORKLOAD | $153,600 | $57,100 | Not Implemented |
UD0613 # 01 Y:2001 | 01 | 2001 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $21,501 | $15,000 | Not Implemented |
UD0613 # 02 Y:2001 | 02 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $15,606 | $14,000 | Implemented |
UD0613 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,566 | $0 | Implemented |
UD0613 # 04 Y:2001 | 04 | 2001 | USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) | $5,513 | $5,000 | Implemented |
UD0613 # 05 Y:2001 | 05 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,342 | $0 | Implemented |
CO0478 # 01 Y:2000 | 01 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,280 | $4,000 | Implemented |
CO0478 # 02 Y:2000 | 02 | 2000 | INSULATE BARE EQUIPMENT | $1,970 | $2,360 | Implemented |
CO0478 # 03 Y:2000 | 03 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,550 | $5,200 | Implemented |
CO0478 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $510 | $290 | Implemented |
CO0478 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $400 | $1,370 | Implemented |
CO0478 # 06 Y:2000 | 06 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $280 | $60 | Implemented |
CO0478 # 07 Y:2000 | 07 | 2000 | INSTALL / REPAIR INSULATION ON STEAM LINES | $240 | $300 | Implemented |
CO0478 # 08 Y:2000 | 08 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $130 | $0 | Implemented |
CO0478 # 09 Y:2000 | 09 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $6,350 | $12,000 | Implemented |
SD0243 # 01 Y:2000 | 01 | 2000 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $17,132 | $28,575 | Not Implemented |
SD0243 # 02 Y:2000 | 02 | 2000 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $8,431 | $7,000 | Not Implemented |
SD0243 # 03 Y:2000 | 03 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,270 | $3,300 | Not Implemented |