IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75

matching recommendations
Reset
SIC 3471 Plating And Polishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0675 # 04 Y:2013 04 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $270 $290 Implemented
CO0675 # 02 Y:2013 02 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,730 $18,100 Not Implemented
CO0675 # 01 Y:2013 01 2013 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $30,250 $172,320 Not Implemented
CO0675 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $810 $1,280 Not Implemented
CO0500 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $80 $0 Not Implemented
CO0500 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $1,110 $4,890 Not Implemented
CO0500 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $290 $50 Implemented
CO0500 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $730 $300 Implemented
CO0500 # 02 Y:2002 02 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,990 $300 Implemented
CO0500 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $29,000 $7,000 Implemented
CO0500 # 03 Y:2002 03 2002 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $2,640 $5,750 Not Implemented
CO0478 # 03 Y:2000 03 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,550 $5,200 Implemented
CO0478 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $510 $290 Implemented
CO0478 # 02 Y:2000 02 2000 INSULATE BARE EQUIPMENT $1,970 $2,360 Implemented
CO0478 # 01 Y:2000 01 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,280 $4,000 Implemented
CO0478 # 09 Y:2000 09 2000 $6,350 $12,000 Implemented
CO0478 # 08 Y:2000 08 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $130 $0 Implemented
CO0478 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $400 $1,370 Implemented
CO0478 # 06 Y:2000 06 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $280 $60 Implemented
CO0478 # 07 Y:2000 07 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $240 $300 Implemented
CO0429 # 02 Y:1998 02 1998 CLOSELY MONITOR CHEMICAL ADDITIONS TO INCREASE BATH LIFE $4,860 $0 Implemented
CO0429 # 03 Y:1998 03 1998 ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT $2,930 $800 Not Implemented
CO0429 # 01 Y:1998 01 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $840 $1,000 Implemented
CO0429 # 05 Y:1998 05 1998 $730 $280 Not Implemented
CO0429 # 04 Y:1998 04 1998 $6,000 $10,160 Implemented