Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
75
matching recommendationsSIC | 3471 | Plating And Polishing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0675 # 04 Y:2013 | 04 | 2013 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $270 | $290 | Implemented |
CO0675 # 03 Y:2013 | 03 | 2013 | INSTALL OCCUPANCY SENSORS | $810 | $1,280 | Not Implemented |
CO0675 # 02 Y:2013 | 02 | 2013 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $9,730 | $18,100 | Not Implemented |
CO0675 # 01 Y:2013 | 01 | 2013 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $30,250 | $172,320 | Not Implemented |
CO0500 # 07 Y:2002 | 07 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $80 | $0 | Not Implemented |
CO0500 # 06 Y:2002 | 06 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $290 | $50 | Implemented |
CO0500 # 05 Y:2002 | 05 | 2002 | INSULATE BARE EQUIPMENT | $730 | $300 | Implemented |
CO0500 # 04 Y:2002 | 04 | 2002 | INSULATE BARE EQUIPMENT | $1,110 | $4,890 | Not Implemented |
CO0500 # 03 Y:2002 | 03 | 2002 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $2,640 | $5,750 | Not Implemented |
CO0500 # 02 Y:2002 | 02 | 2002 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $8,990 | $300 | Implemented |
CO0500 # 01 Y:2002 | 01 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $29,000 | $7,000 | Implemented |
CO0478 # 01 Y:2000 | 01 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,280 | $4,000 | Implemented |
CO0478 # 09 Y:2000 | 09 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $6,350 | $12,000 | Implemented |
CO0478 # 06 Y:2000 | 06 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $280 | $60 | Implemented |
CO0478 # 08 Y:2000 | 08 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $130 | $0 | Implemented |
CO0478 # 07 Y:2000 | 07 | 2000 | INSTALL / REPAIR INSULATION ON STEAM LINES | $240 | $300 | Implemented |
CO0478 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $400 | $1,370 | Implemented |
CO0478 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $510 | $290 | Implemented |
CO0478 # 03 Y:2000 | 03 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,550 | $5,200 | Implemented |
CO0478 # 02 Y:2000 | 02 | 2000 | INSULATE BARE EQUIPMENT | $1,970 | $2,360 | Implemented |
CO0429 # 04 Y:1998 | 04 | 1998 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $6,000 | $10,160 | Implemented |
CO0429 # 01 Y:1998 | 01 | 1998 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $840 | $1,000 | Implemented |
CO0429 # 02 Y:1998 | 02 | 1998 | CLOSELY MONITOR CHEMICAL ADDITIONS TO INCREASE BATH LIFE | $4,860 | $0 | Implemented |
CO0429 # 05 Y:1998 | 05 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $730 | $280 | Not Implemented |
CO0429 # 03 Y:1998 | 03 | 1998 | ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT | $2,930 | $800 | Not Implemented |