IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

482

matching recommendations
Reset
SIC 3479 Metal Coating And Allied Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0526 # 02 Y:2016 02 2016 USE RADIANT HEATER FOR SPOT HEATING $24,527 $35,260 Implemented
WV0526 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,991 $180 Implemented
WV0526 # 04 Y:2016 04 2016 DEVELOP A REPAIR/REPLACE POLICY $1,872 $1,122 Implemented
WV0526 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,654 $46 Implemented
UA0146 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,612 $800 Implemented
UA0146 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,141 $27,750 Implemented
UA0146 # 07 Y:2015 07 2015 INSTALL TIMERS AND/OR THERMOSTATS $2,583 $80 Implemented
UA0130 # 03 Y:2014 03 2014 INSTALL TIMERS AND/OR THERMOSTATS $2,774 $200 Implemented
UA0130 # 04 Y:2014 04 2014 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,266 $0 Implemented
UA0130 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,890 $100 Implemented
UM0444 # 04 Y:2014 04 2014 USE MINIMUM STEAM OPERATING PRESSURE $6,638 $5,000 Implemented
WM0034 # 06 Y:2013 06 2013 IMPROVE SPACE COMFORT CONDITIONING $3,125 $550 Implemented
UD0876 # 01 Y:2013 01 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,570 $0 Implemented
UD0876 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $2,184 $0 Implemented
UD0876 # 04 Y:2013 04 2013 BASE UTILITY CHARGES ON USAGE RATHER THAN AREA OCCUPIED $1,416 $1,400 Implemented
UD0876 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $5,943 $6,500 Implemented
UD0876 # 06 Y:2013 06 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $1,557 $0 Implemented
UD0876 # 07 Y:2013 07 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $630 $0 Implemented
UD0876 # 10 Y:2013 10 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $706 $1,000 Implemented
UD0876 # 12 Y:2013 12 2013 USE RADIANT HEATER FOR SPOT HEATING $10,039 $15,000 Implemented
UD0876 # 13 Y:2013 13 2013 AIR CONDITION ONLY SPACE NECESSARY $1,344 $0 Implemented
TT0102 # 01 Y:2013 01 2013 USE OPTIMUM THICKNESS INSULATION $11,651 $2,925 Implemented
TT0102 # 02 Y:2013 02 2013 UPGRADE CONTROLS ON COMPRESSORS $12,842 $21,000 Implemented
TT0102 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,735 $3,000 Implemented
TT0102 # 04 Y:2013 04 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $82 $20 Implemented