Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 3479 | Metal Coating And Allied Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0691 # 06 Y:2012 | 06 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $249 | $200 | Implemented |
MA0691 # 05 Y:2012 | 05 | 2012 | INSULATE BARE EQUIPMENT | $772 | $1,575 | Implemented |
MA0562 # 07 Y:2004 | 07 | 2004 | INSTALL OCCUPANCY SENSORS | $361 | $512 | Implemented |
MA0562 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,626 | $250 | Implemented |
MA0562 # 03 Y:2004 | 03 | 2004 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,445 | $650 | Implemented |
MA0562 # 02 Y:2004 | 02 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,584 | $2,465 | Implemented |
MA0544 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $543 | $20 | Implemented |
MA0544 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,646 | $6,156 | Implemented |
MA0544 # 01 Y:2003 | 01 | 2003 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $3,663 | $2,000 | Implemented |
MA0459 # 02 Y:2000 | 02 | 2000 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,064 | $150 | Implemented |
MA0459 # 06 Y:2000 | 06 | 2000 | INSTALL OCCUPANCY SENSORS | $55 | $248 | Implemented |
MA0459 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $789 | $150 | Implemented |
MA0441 # 06 Y:1999 | 06 | 1999 | INSULATE BARE EQUIPMENT | $632 | $2,250 | Implemented |
MA0441 # 05 Y:1999 | 05 | 1999 | UPGRADE OBSOLETE EQUIPMENT | $789 | $0 | Implemented |
MA0441 # 02 Y:1999 | 02 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $43,200 | $3,000 | Implemented |
MA0441 # 01 Y:1999 | 01 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $21,168 | $5,704 | Implemented |
MA0312 # 05 Y:1994 | 05 | 1994 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $3,394 | $35,728 | Implemented |
MA0312 # 04 Y:1994 | 04 | 1994 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $372 | $1,094 | Implemented |
MA0312 # 02 Y:1994 | 02 | 1994 | USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING | $4,017 | $80,000 | Implemented |
MA0186 # 01 Y:1990 | 01 | 1990 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $1,664 | $5,000 | Implemented |
MA0186 # 06 Y:1990 | 06 | 1990 | COVER OPEN TANKS | $1,262 | $229 | Implemented |
MA0186 # 05 Y:1990 | 05 | 1990 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,130 | $1,195 | Implemented |
MA0186 # 04 Y:1990 | 04 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,333 | $9,634 | Implemented |
MA0186 # 03 Y:1990 | 03 | 1990 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,848 | $500 | Implemented |