Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
46
matching recommendationsSIC | 3479 | Metal Coating And Allied Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0444 # 05 Y:2014 | 05 | 2014 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $104,300 | $208,000 | Not Implemented |
UM0444 # 04 Y:2014 | 04 | 2014 | USE MINIMUM STEAM OPERATING PRESSURE | $6,638 | $5,000 | Implemented |
UM0444 # 03 Y:2014 | 03 | 2014 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $67,306 | $80,000 | Not Implemented |
UM0444 # 02 Y:2014 | 02 | 2014 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $71,820 | $133,000 | Not Implemented |
UM0444 # 01 Y:2014 | 01 | 2014 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $216,000 | $500,000 | Not Implemented |
UM0376 # 06 Y:2010 | 06 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,126 | $2,000 | Implemented |
UM0376 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,368 | $36,732 | Implemented |
UM0376 # 02 Y:2010 | 02 | 2010 | INSTALL OCCUPANCY SENSORS | $7,625 | $250 | Implemented |
UM0376 # 03 Y:2010 | 03 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,381 | $9,416 | Implemented |
UM0376 # 04 Y:2010 | 04 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,012 | $6,547 | Implemented |
UM0376 # 05 Y:2010 | 05 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,793 | $200 | Implemented |
UM0376 # 07 Y:2010 | 07 | 2010 | OPTIMIZE PLANT POWER FACTOR | $2,850 | $2,850 | Implemented |
UM0376 # 08 Y:2010 | 08 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $248 | $10 | Implemented |
UM0376 # 09 Y:2010 | 09 | 2010 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,943 | $2,800 | Implemented |
UM0376 # 10 Y:2010 | 10 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $582 | $6,500 | Implemented |
UM0376 # 11 Y:2010 | 11 | 2010 | HEAT WATER WITH EXHAUST HEAT | $35,366 | $24,762 | Not Implemented |
UM0238 # 02 Y:2003 | 02 | 2003 | COVER OPEN TANKS | $28,130 | $2,624 | Implemented |
UM0238 # 08 Y:2003 | 08 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $924 | $1,000 | Not Implemented |
UM0238 # 07 Y:2003 | 07 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,520 | $895 | Implemented |
UM0238 # 06 Y:2003 | 06 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,280 | $2,600 | Not Implemented |
UM0238 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $6,485 | $8,300 | Implemented |
UM0238 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,950 | $150 | Implemented |
UM0238 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,191 | $18,246 | Not Implemented |
UM0238 # 01 Y:2003 | 01 | 2003 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $55,000 | $24,610 | Not Implemented |
UM0229 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,970 | $300 | Not Implemented |