IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
SIC 3479 Metal Coating And Allied Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0445 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,741 $6,692 Implemented
LE0445 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $525 $750 Implemented
LE0445 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,590 $1,500 Implemented
LE0445 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,107 $1,000 Implemented
DL0047 # 03 Y:2010 03 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,212 $0 Implemented
DL0047 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $3,491 $1,573 Implemented
DL0047 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,000 $6,000 Implemented
DL0047 # 05 Y:2010 05 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,068 $0 Implemented
DL0047 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $6,774 $0 Implemented
DL0047 # 11 Y:2010 11 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $750 $2,800 Implemented
LE0177 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,194 $0 Implemented
LE0177 # 04 Y:2004 04 2004 USE OPTIMUM THICKNESS INSULATION $516 $585 Implemented
LE0110 # 01 Y:2001 01 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $19,815 $300 Implemented
LE0110 # 03 Y:2001 03 2001 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $1,628 $500 Implemented
LE0110 # 04 Y:2001 04 2001 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,500 $0 Implemented
WV0208 # 01 Y:2001 01 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $13,153 $950 Implemented
WV0208 # 11 Y:2001 11 2001 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $896 $100 Implemented
WV0208 # 13 Y:2001 13 2001 $42,527 $36,400 Implemented
WV0208 # 02 Y:2001 02 2001 USE SYNTHETIC LUBRICANT $303 $254 Implemented
WV0208 # 03 Y:2001 03 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $486 $90 Implemented
WV0208 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $1,754 $138 Implemented
WV0208 # 09 Y:2001 09 2001 RECYCLE CLEANING SOLVENT AND REUSE $2,056 $8,000 Implemented
WV0208 # 10 Y:2001 10 2001 $2,000 $800 Implemented
WV0208 # 08 Y:2001 08 2001 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $2,538 $5,604 Implemented
WV0208 # 04 Y:2001 04 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $633 $340 Implemented