Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
75
matching recommendationsSIC | 3479 | Metal Coating And Allied Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0560 # 01 Y:2004 | 01 | 2004 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $42,752 | $238,150 | Implemented |
MA0560 # 02 Y:2004 | 02 | 2004 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $32,756 | $23,710 | Implemented |
MA0560 # 03 Y:2004 | 03 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,875 | $1,200 | Implemented |
MA0560 # 04 Y:2004 | 04 | 2004 | INSTALL OCCUPANCY SENSORS | $317 | $256 | Implemented |
MA0560 # 05 Y:2004 | 05 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $230 | $175 | Implemented |
MA0562 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,626 | $250 | Implemented |
MA0562 # 04 Y:2004 | 04 | 2004 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $2,903 | $0 | Not Implemented |
MA0562 # 03 Y:2004 | 03 | 2004 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,445 | $650 | Implemented |
MA0562 # 02 Y:2004 | 02 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,584 | $2,465 | Implemented |
MA0562 # 01 Y:2004 | 01 | 2004 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $22,961 | $139,400 | Not Implemented |
MA0562 # 06 Y:2004 | 06 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $820 | $1,640 | Not Implemented |
MA0562 # 07 Y:2004 | 07 | 2004 | INSTALL OCCUPANCY SENSORS | $361 | $512 | Implemented |
BD0266 # 08 Y:2004 | 08 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $329 | $510 | Implemented |
BD0266 # 12 Y:2004 | 12 | 2004 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $1,404 | $2,500 | Implemented |
BD0266 # 11 Y:2004 | 11 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $3,200 | $96 | Implemented |
BD0266 # 10 Y:2004 | 10 | 2004 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $1,020 | $96 | Implemented |
BD0266 # 09 Y:2004 | 09 | 2004 | INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION | $2,462 | $1,575 | Not Implemented |
BD0266 # 01 Y:2004 | 01 | 2004 | BURN A LESS EXPENSIVE GRADE OF FUEL | $260 | $11,000 | Implemented |
BD0266 # 02 Y:2004 | 02 | 2004 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $6,225 | $4,930 | Implemented |
BD0266 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,992 | $600 | Implemented |
BD0266 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,081 | $2,765 | Implemented |
BD0266 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $382 | $323 | Implemented |
BD0266 # 05 Y:2004 | 05 | 2004 | INSTALL OCCUPANCY SENSORS | $703 | $1,425 | Implemented |
BD0266 # 06 Y:2004 | 06 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $504 | $220 | Implemented |
WI0474 # 03 Y:2004 | 03 | 2004 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $22,030 | $17,000 | Not Implemented |