IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

364

matching recommendations
Reset
SIC 348 Ordnance And Accessories, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0036 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $912 $1,500 Implemented
UA0036 # 07 Y:2009 07 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,637 $17,500 Not Implemented
UA0036 # 08 Y:2009 08 2009 USE PHOTOCELL CONTROLS $453 $1,337 Not Implemented
MA0634 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,014 $119,495 Implemented
MA0634 # 02 Y:2008 02 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $11,407 $20,000 Not Implemented
MA0634 # 03 Y:2008 03 2008 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,058 $3,000 Not Implemented
MA0634 # 04 Y:2008 04 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,932 $2,500 Implemented
MA0634 # 05 Y:2008 05 2008 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $1,034 $6,000 Not Implemented
MA0634 # 06 Y:2008 06 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $498 $500 Implemented
OR0523 # 01 Y:2007 01 2007 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $35,000 $60,000 Implemented
OR0523 # 02 Y:2007 02 2007 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $77,000 $5,000 Not Implemented
OR0523 # 03 Y:2007 03 2007 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,350,000 $32,700 Not Implemented
OR0523 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $1,220 $1,160 Implemented
OR0523 # 05 Y:2007 05 2007 COVER OPEN TANKS $3,000 $9,000 Not Implemented
IA0394 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $41,729 $4,200 Implemented
IA0394 # 02 Y:2006 02 2006 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $24,709 $6,500 Implemented
IA0394 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,998 $25 Implemented
IA0394 # 04 Y:2006 04 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,184 $74 Not Implemented
IA0394 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $17,292 $44,400 Not Implemented
IA0394 # 06 Y:2006 06 2006 RECOVER WASTE HEAT FROM EQUIPMENT $16,584 $15,900 Not Implemented
IA0394 # 07 Y:2006 07 2006 RECOVER WASTE HEAT FROM EQUIPMENT $25,628 $15,200 Not Implemented
IA0394 # 08 Y:2006 08 2006 INSULATE BARE EQUIPMENT $2,083 $1,969 Not Implemented
AS0415 # 01 Y:2006 01 2006 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $19,739 $5,500 Implemented
AS0415 # 02 Y:2006 02 2006 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,463 $24,000 Not Implemented
AS0415 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,372 $1,000 Implemented